Respirator Audit Logic Database
November 2006
NIOSH Docket Number 081
In August 2006, a list of all of the approval numbers on file with the Technology Evaluation Branch, NPPTL, was sent to each NIOSH Approval Holder. At the manufacturers meeting held on October 11, 2006, NIOSH/NPPTL informed the respirator manufacturers that the original deadline for Approval Holders to submit responses was extended to December 2006, and then subsequently extended to August 7, 2007. The information requested is vital in developing an operational database for the Respirator Audit Logic Post Certification Audit Selection.
Materials Under Evaluation
Letter to all respirator manufacturers – 11/3/06 [PDF - 841 KB]
Letter to all respirator manufacturers – 7/11/07 [PDF - 1,160 KB]
Submissions from the Public in Order of Receipt
Submission to Powelko (NPPTL/NIOSH) from Kay (Ocenco, Inc.) – 7/13/07 [PDF - 837 KB]
Submission to Powelko (NPPTL/NIOSH) from Desantis (SafetyTech International, Inc.) – 7/16/06 [PDF - 702 KB]
Submission to Powelko (NPPTL/NIOSH) from Chesebro (Jackson Safety Products) – 7/17/07 [PDF - 1,850 KB]
Submission to Powelko (NPPTL/NIOSH) from Watkins (ArcOne) – 7/24/07 [PDF - 1,630 KB]
Submission to Powelko (NPPTL/NIOSH) from Colton (3M) – 7/27/07 [PDF - 5,620 KB]
Submission to Powelko (NPPTL/NIOSH) from Noernberg (US SAFETY) – 8/6/07 [PDF - 2,330 KB]
Submission to Powelko (NPPTL/NIOSH) from Schultz (Bio-Medical Devices) – 8/7/07 [PDF - 4,540 KB]
Submission to Powelko (NPPTL/NIOSH) from Colton (3M) – 9/6/07 [PDF - 5,620 KB]
- Page last reviewed: July 6, 2010
- Page last updated: July 6, 2010
- Content source:
- National Institute for Occupational Safety and Health Education and Information Division