Skip directly to search Skip directly to A to Z list Skip directly to navigation Skip directly to page options Skip directly to site content

Respirator Audit Logic Database

November 2006
NIOSH Docket Number 081

In August 2006, a list of all of the approval numbers on file with the Technology Evaluation Branch, NPPTL, was sent to each NIOSH Approval Holder. At the manufacturers meeting held on October 11, 2006, NIOSH/NPPTL informed the respirator manufacturers that the original deadline for Approval Holders to submit responses was extended to December 2006, and then subsequently extended to August 7, 2007. The information requested is vital in developing an operational database for the Respirator Audit Logic Post Certification Audit Selection.

Materials Under Evaluation

Letter to all respirator manufacturers – 11/3/06 [PDF - 841 KB]

Letter to all respirator manufacturers – 7/11/07 [PDF - 1,160 KB]

Submissions from the Public in Order of Receipt

Submission to Powelko (NPPTL/NIOSH) from Kay (Ocenco, Inc.) – 7/13/07 [PDF - 837 KB]

Submission to Powelko (NPPTL/NIOSH) from Desantis (SafetyTech International, Inc.) – 7/16/06 [PDF - 702 KB]

Submission to Powelko (NPPTL/NIOSH) from Chesebro (Jackson Safety Products) – 7/17/07 [PDF - 1,850 KB]

Submission to Powelko (NPPTL/NIOSH) from Watkins (ArcOne) – 7/24/07 [PDF - 1,630 KB]

Submission to Powelko (NPPTL/NIOSH) from Colton (3M) – 7/27/07 [PDF - 5,620 KB]

Submission to Powelko (NPPTL/NIOSH) from Noernberg (US SAFETY) – 8/6/07 [PDF - 2,330 KB]

Submission to Powelko (NPPTL/NIOSH) from Schultz (Bio-Medical Devices) – 8/7/07 [PDF - 4,540 KB]

Submission to Powelko (NPPTL/NIOSH) from Colton (3M) – 9/6/07 [PDF - 5,620 KB]

Top