Component failures in the electrical control circuits of mining machines account for a large percentage of the total downtime of the machine. Once a failure has occurred it is always a tedious and usually a time-consuming task to locate the failed component. Moreover. the pressure to quickly locate the cause of a delay can lead to compromises in safety. Thus an onboard diagnostic system. essential for an automated machine, would be a very useful addition to existing machines. This report details U.S. Bureau of Mines development of a generic procedure for synthesizing diagnostic systems for electrical-control-circuit failures in mining machinery. A continuous mining machine is used as the testbed to illustrate the application of the developed methodology. Substantive differences among mining machine control circuits made it impossible to achieve a generic diagnostic system. but a generic approach for the synthesis of the diagnostic system was possible. As the research progressed. it became apparent that an algorithmic approach was better than an expert-system-based implementation. A prototype system was constructed and used to evaluate the diagnostic system. Prototype implementation issues are also examined.
Authors: JL Kohler, J Sottile
Report of Investigations - January 1993
NIOSHTIC2 Number: 10003140
U.S. Department of the Interior, Bureau of Mines, Report of Investigations 9443, 1993 Jan:1-24
See Also
- Engineering Considerations and Selection Criteria for Proximity Warning Systems for Mining Operations
- A GPS Based System for Minimizing Jolts to Heavy Equipment Operators
- Handbook for Dust Control in Mining
- Heavy Construction Equipment Noise Study Using Dosimetry and Time-Motion Studies
- A Measurement Method for Determining Absorption Coefficients for Underground Mines
- Mine Power Systems
- Musculoskeletal Symptoms Among Operators of Heavy Mobile Equipment
- Programmable Electronic Mining Systems: Best Practice Recommendations (In Nine Parts): Part 4: 3.0 Safety File
- Programmable Electronic Mining Systems: Best Practice Recommendations (In Nine Parts): Part 5: 4.0 Independent Functional Safety Assessment
- Sound Restoration Hearing Protection: Genesis of a Standard Test Method
- Content source: National Institute for Occupational Safety and Health, Mining Program