Ames Laboratory
(Site Profile/Docket Number 079)
Location: Ames, Iowa
Also Known As: Iowa State University
Special Exposure Cohort Petition Information
The Special Exposure Cohort (SEC) is a unique category of employees established by the Act (42 CFR Part 83). Claims compensated under the SEC do not have to go through the dose reconstruction process. To qualify for compensation under the SEC, a covered employee must meet specific requirements (e.g., must have at least one of 22 “specified cancers,” and have worked for a specified time period at one of the SEC sites). Classes of employees and work sites can be considered for addition to the SEC through a NIOSH petition process. More information about the Special Exposure Cohort can be found on our Frequently Asked Questions page.
Open/Active SEC Petitions
To date, there are no open/active SEC petitions from Ames Laboratory.
Class(es) Added to the SEC
- Ames Laboratory–Department of Energy (DOE) employees or DOE contractor or subcontractor employees who worked at the Ames Laboratory in one or more of the following facilities/locations: Chemistry Annex 1 (also known as “the old women’s gymnasium” and “Little Ankeny”), Chemistry Annex 2, Chemistry Building (also known as “Gilman Hall”), Research Building, or the Metallurgical Building (also known as “Harley Wilhelm Hall”) from January 1, 1942 through December 31, 1954 for a number of work days aggregating at least 250 work days, or in combination with work days within the parameters (excluding aggregate work day requirements) established for one or more classes of employees in the SEC, and who were monitored or should have been monitored.Note: This class was established from Petition 38
- Ames Laboratory–Sheet metal workers, physical plant maintenance and associated support staff (including all maintenance shop personnel), and supervisory staff who were monitored or should have been monitored for potential internal radiation exposures associated with the maintenance and renovation activities of the thorium production areas in Wilhelm Hall (a.k.a. the Metallurgy Building or “Old” Metallurgy Building) at the Ames Laboratory from January 1, 1955, through December 31, 1970, for a number of work days aggregating at least 250 work days or in combination with work days within the parameters established for one or more other classes of employees in the Special Exposure CohortNote: This class was established from Petition 75
- Ames Laboratory–All employees of the Department of Energy, its predecessor agencies, and its contractors and subcontractors who worked in any area of the Department of Energy facility at the Ames Laboratory from January 1, 1955 through December 31, 1960, for a number of work days aggregating at least 250 work days, occurring either solely under this employment, or in combination with work days within the parameters established for one or more other classes of employees in the Special Exposure CohortNote: This class was established from Petition 166
- Ames Laboratory–All Department of Energy (DOE) employees, its predecessor agencies, and its contractors and subcontractors who worked in any area of the Ames Laboratory at Iowa State University during the period from August 13, 1942 through December 31, 1970, for a number of work days aggregating at least 250 work days, occurring either solely under this employment or in combination with work days within the parameters established for one or more classes of employees included in the Special Exposure CohortNote: This class was established from Petition 185
Petitions Qualified for Evaluation
Below is a list of the petitions that qualified for evaluation. Select a petition on the list to view the table for that particular petition.
Petition 38 (Jan 1, 1942 to Dec 31, 1955)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received | June 29, 2005 |
Date Qualified for Evaluation | September 23, 2005 |
Summary of Information in Petition |
Location: Ames, Iowa
Job Titles and/or Job Duties: All scientists; production workers; technicians; salaried graduate students; physical plant workers; maintenance, administrative and support staff; and subcontracted workers Period of Employment: January 1, 1942 through December 31, 1955 |
Copy of the Petition Received | Ames Laboratory Petition |
Federal Register Notice Announcing that a Ames Laboratory SEC Petition has met the Minimum Qualifications for Review and Evaluation | October 17, 2005 [77 KB (1 page)] |
SEC Petition Evaluation Report | Approved April 10, 2006 [180 KB (35 pages)] |
Evaluation Report Sent to the Advisory Board | April 10, 2006 |
Petition Discussed by the Advisory Board | The petition covering January 1, 1942, through December 31, 1955, was discussed during the June 15, 2006, Advisory Board meeting.
Note: Agendas and transcripts for Board meetings will be posted on the Advisory Board and Public Meetings page as soon as they become available. |
Advisory Board Recommendation on SEC Petition | July 5, 2006 [263 KB (2 pages)] |
HHS Letters to Congress Regarding the SEC Petition | August 8, 2006 [259 KB (6 pages)] |
HHS Designation of Additional Members to the SEC | August 8, 2006 [166 KB (4 pages)] |
Federal Register Notice: Designation/Determination Regarding a Class of Employees for Addition to the Special Exposure Cohort |
September 7, 2006 [46 KB (1 page)]
Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC. |
Effective Date for the SEC Class | September 7, 2006 |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort | September 22, 2006 [103 KB (2 pages)] |
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC | September 12, 2006 [43 KB (1 page)] |
Petition 75 (Jan 1, 1955 to Dec 31, 1970)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received | October 23, 2006 |
Date Qualified for Evaluation | January 30, 2007 |
Summary of Information in Petition |
Location: Ames, Iowa
Job Titles and/or Job Duties: All sheet metal workers, physical plant maintenance and associated support staff (includes all maintenance shop personnel) of Ames Laboratory and supervisory staff that may have been exposed to the maintenance and renovation activities of the thorium production areas in Wilhelm Hall (also known as the Metallurgy Building or ”Old” Metallurgy Building) Period of Employment: January 1, 1955 through December 31, 1970 |
Copy of the Petition Received | Ames Laboratory Petition |
Federal Register Notice Announcing that a Ames Laboratory SEC Petition has met the Minimum Qualifications for Review and Evaluation | March 1, 2007 [45 KB (1 page)] |
SEC Petition Evaluation Report |
SEC Petition Evaluation Report: Petition SEC-00075 [228 KB (31 pages)] Approved May 14, 2007 |
Evaluation Report Sent to the Advisory Board | May 16, 2007 |
Petition Discussed by the Advisory Board | The petition covering January 1, 1955, through December 31, 1970, was discussed on July 18, 2007, during the Advisory Board’s regular meeting.
Note: Agendas and transcripts for Board meetings will be posted on the Advisory Board and Public Meetings page as soon as they become available. |
Advisory Board Recommendation on SEC Petition | August 9, 2007 [89 KB (2 pages)] |
HHS Letters to Congress Regarding the SEC Petition | September 12, 2007 [298 KB (6 pages)] |
HHS Designation of Additional Members to the SEC | September 12, 2007 [202 KB (4 pages)] |
Federal Register Notice: Designation Regarding a Class of Employees for Addition to the Special Exposure Cohort |
September 28, 2007 [77 KB (1 page)]
Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC. |
Effective Date for the SEC Class | October 12, 2007 |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort | October 29, 2007 [82 KB (1 page)] |
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC | October 19, 2007 [20 KB (1 page)] |
Petition 166 (Jan 1, 1955 to Dec 31, 1960)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received | February 12, 2010 |
Date Qualified for Evaluation | March 26, 2010 |
Summary of Information in Petition |
Location: Ames, Iowa
Job Titles and/or Job Duties: Scientists, production workers, technicians, salaried graduate students, physical plant workers, administrative and support staff who worked in the Atomic Energy Commission and Department of Energy facilities on the Ames Laboratory Campus variably known as Annexes 1 and 2, Hot Canyon, Wilhelm Hall or Metallurgy Building, Spedding Hall, Research and Chemistry Buildings. Period of Employment: January 1, 1955 through December 31, 1960 |
Copy of the Petition Received | February 12, 2010 [897 KB (29 pages)] |
Federal Register Notice Announcing that a Ames Laboratory SEC Petition has met the Minimum Qualifications for Review and Evaluation | April 8, 2010 [71 KB (1 page)] |
SEC Petition Evaluation Report |
SEC Petition Evaluation Report: Petition SEC-00166 [457 KB (88 pages)] Approved July 30, 2010 |
Evaluation Report Sent to the Advisory Board | July 30, 2010 |
Petition Discussed by the Advisory Board | The petition covering January 1, 1955, through December 31, 1960, was discussed by the Advisory Board on August 11, 2010, during its regular meeting.
Note: Agendas and transcripts for Board meetings will be posted on the Advisory Board and Public Meetings page as soon as they become available. |
Advisory Board Recommendation on SEC Petition | September 1, 2010 [48 KB (2 pages)] |
HHS Letters to Congress Regarding the SEC Petition | October 6, 2010 [107 KB (10 pages)] |
HHS Designation of Additional Members to the SEC | October 6, 2010 [38 KB (5 pages))] |
Federal Register Notice: Designation Regarding a Class of Employees for Addition to the Special Exposure Cohort |
October 21, 2010 [48 KB (1 page)]
Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC. |
Effective Date for the SEC Class | November 5, 2010 |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort | December 1, 2010 [52 KB (1 page)] |
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC | November 8, 2010 [29 KB (1 page)] |
Petition 185 (Aug 13, 1942 to Dec 31, 1970)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received | April 7, 2011 |
Date Qualified for Evaluation | June 13, 2011 |
Summary of Information in Petition |
Location: Ames, Iowa
Job Titles and/or Job Duties: All Department of Energy (DOE) employees, its predecessor agencies, and its contractors and subcontractors who worked in any area of the DOE facility Period of Employment: January 1, 1942 through December 31, 1970 |
Copy of the Petition Received | April 7, 2011 [146 KB (2 pages)] |
Federal Register Notice Announcing that a Ames Laboratory SEC Petition has met the Minimum Qualifications for Review and Evaluation | April 25, 2011 [80 KB (1 page)] |
SEC Petition Evaluation Report |
Ames Laboratory SEC Petition Evaluation Report, Rev. 1 (August 13, 1942 through December 31, 1970) [375 KB (49 pages)] Revised July 14, 2011; Corrects the start date to match the Manhattan Engineering District start date |
Evaluation Report Sent to the Advisory Board | July 14, 2011 |
Petition Discussed by the Advisory Board | The Advisory Board discussed the petition on August 25, 2011, during its regular meeting. The Advisory Board previously discussed the petition via teleconference on July 11, 2011.
Note: Agendas and transcripts for Board meetings will be posted on the Advisory Board and Public Meetings page as soon as they become available. |
Advisory Board Recommendation on SEC Petition | September 14, 2011 [48 KB (2 pages)] |
HHS Letters to Congress Regarding the SEC Petition | October 18, 2011 [104 KB (10 pages)] |
HHS Designation of Additional Members to the SEC | October 18, 2011 [42 KB (5 pages)] |
Federal Register Notice: Designation Regarding a Class of Employees for Addition to the Special Exposure Cohort |
November 4, 2011 [51 KB (1 page)]
Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC. |
Effective Date for the SEC Class | November 17, 2011 |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort | November 28, 2011 [170 KB (1 page)] |
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC | November 17, 2011 [29 KB (1 page)] |
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Worker Outreach Activities for the Ames Laboratory:
No activities are scheduled at this time.
Technical Documents
If the energy employee’s personal radiation information is incomplete, NIOSH will use other sources to estimate the radiation dose. This may involve using technical documents called Site Profiles, Technical Basis Documents, and Technical Information Bulletins.
Site Profile
- Site Profile for Ames Laboratory [1.1 MB (90 pages)]
Revised January 3, 2012
Revision initiated to include SEC-00185. Section 1.3.4 was added. Section 1.3 edited to update partial dose reconstruction information and to introduce new SEC. Sections 1.3.1 and 1.3.2 were edited to show inclusion of all workers in those SECs. Expansion of class was inserted in sections of the document as necessary. Section 5.4.1 edited to state environmental doses should be applied to certain Research Building workers. Battelle 2006a was updated to Battelle 2011 and Battelle 2006b was canceled and replaced with other references. Changes were made to several sections and tables in Sections 5.1 and 6.3. Section 6.3.1.2 was updated to reduce missed dose component of beta doses in Table 6-7. Incorporates formal internal and NIOSH review comments. Constitutes a total rewrite of the document.
Advisory Board and NIOSH Discussions on Ames Laboratory
The Ames Laboratory discussion papers listed below are working documents prepared by NIOSH or its contractor for use in discussions with the Advisory Board on Radiation and Worker Health or its Working Groups or Subcommittees. Draft, preliminary, interim, and white paper documents are not final NIOSH or Advisory Board (or their technical support and review contractors) positions unless specifically marked as such. These documents represent preliminary positions taken on technical issues prepared by NIOSH or its contractor.
The discussion papers have been reviewed to identify and redact any information that is protected by the Privacy Act 5 USC §552a and have been cleared for distribution.
- SC&A Draft: SC&A’s Review of the NIOSH Document Issued March 3, 2016, Titled, “Discussion of Ames Laboratory TBD Findings on External Dose” [97 KB (12 pages)]
Contract No. 211-2014-58081
SCA-TR-2016-SP007, Rev. 0
June 28, 2016 - NIOSH/DCAS: Discussion of Ames Laboratory TBD Findings on External Dose [229 KB (16 pages)]
Rev. 0, March 3, 2016 - NIOSH/ORAU: NIOSH Response to SC&A Review of the Ames Site Profile Document Regarding Uranium Internal Exposures [286 KB (20 pages)]
July 29, 2015 - SC&A Draft: A Preliminary Review of NIOSH’s Program Evaluation Report DCAS-PER-037, “Ames Laboratory TBD Revision” [119 KB (23 pages)]
Contract No. 200-2004-03805
SCA-TR-PR2013-0037, Rev. 0
January 2, 2013
Program Evaluation Plans (PEPs) and Program Evaluation Reports (PERs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the new information may result in an increase in dose for a completed dose reconstruction with a probability of causation of less than 50%, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
- DCAS-PER-037 Rev-0: Revision 3 of the Ames Laboratory Technical Basis Document (ORAU-TKBS-0055) [21 KB (3 pages)]July 17, 2012About this Document: Revision 3 of the Ames Laboratory Technical Basis Document (ORAU-TKBS-0055) was issued on 1/3/2012. The previous version (revision 2) was issued on 1/14/2011. Revision 1 was issued 12/18/2009 and Revision 0 PC-1 was issued 8/20/2008. This PER considered the changes that were made between the current revision (revision 3) and all previous versions of the TBD.
Summary: For the 16 claims requiring further evaluation, dose was recalculated using all current dose reconstruction methods including the current version of the TBD. Only one claim resulted in a probability of causation greater than 50%. NIOSH will notify DOL of these results and request a return of the one case that would now be greater than 50%.
Public Comments on Ames Laboratory Documents
How to Submit Comments
Comments on Ames Laboratory Documents can be submitted to the NIOSH Docket Officer electronically by email at nioshdocket@cdc.gov or printed comments can be mailed to:
NIOSH Docket Office
Robert A. Taft Laboratories, MS-C34
1090 Tusculum Avenue
Cincinnati, OH 45226
Please include the Site Profile/Docket Number (079) on all comments.
Comments Received
At this time, no comments have been submitted.
Document Archive for Ames Laboratory
- Site Profile for Ames Laboratory
- Revised January 14, 2011 [968 KB (87 pages)]Revision Includes: Incorporates SEC-00166. Section 1.3.3 and Table 1-3 added. Section 2.1.6 updated to note the end of hot cell operations in the Research Building. Paragraph added in Section 5.0 to discuss SEC-00166. Section 5.1.1.3 updated with internal intake information from SEC-00166. Table 5-4 and 5-8 updated with updated intake rates. Section 5.4.1 updated to remove statement that intakes from the Research Building hot cell would be negligible. Removed A&A point. Added SEC-00166 to the reference section as NIOSH 2010. Incorporates formal internal and NIOSH review comments. Constitutes a total rewrite of the document.
- Revised December 18, 2009 [1 MB (96 pages)]Revision Includes: Approved revision to add LAT chest doses for all periods, skin doses for various parts of the body, and an explanation of terminology. Sections 3.0 and 3.1 were modified as a result of these changes. Tables 3-1 through 3-6 were modified and Tables 3-7 and 3-8 were added. The definition of occupational medical dose was revised and three reference titles were changed. Wording in Section 6.2.1 about external uranium dose was modified. Revision made to add unmonitored doses prior to 1953. Section 6.2.1 reworded to remove OTIB-0004 discussion and add new methodology. Section 6.3.1 was modified to include two eras of unmonitored doses. Figure 6-2 was altered to reflect the new unmonitored dose methodology for doses prior to 1953. Table 5-1 was separated into three tables. Changes were made to Table 5-7 (now 5-8) to clarify and correct intake values. Wording was added to Section 1.3 to caution the Dose Reconstructor on when to label the DR as a partial DR. Incorporates formal internal and NIOSH review comments. Constitutes a total rewrite or the document.
- Revised August 20, 2008 [1.8 MB (87 pages)]Page Change Revision Includes: Approved page change revision made to include SEC-00075 on pages 10 and 11 in Section 1.3 where Sections 1.3.1, 1.3.2 and Table 1-2 were added. NIOSH required language was revised on pages 9 and 10 in Section 1.1. Added reference on page 74. Incorporates formal internal review comments. As a result of formal internal review, editorial changes were made on the following pages: 8 in Acronym and Abbreviations Section; 11 (Table 1-2), 25 (Table 4- 1), 30 (Table 4-2), 32 (Table 4-6), 34 (Table 5-1), 36 (Table 5-2 and 5-3), 48 (Table 5-6), 51 (Table 6-1), in Sections 1.3, 4.2, 4.4, 4.7, 5.0, 5.1, 5.4, and 6.2. SEC changes occurred on pages 11 (Table 1-1), 32, 33, 37-39 (Table 5-4), 40, 41, 46 (Table 5-5), 49 (Table 5-7), 50, 57, 60, 61 (Table 6-4), 63 (Figure 6-2) in Sections 1.3, 4.7, 5.0, 5.1, 5.2, 5.3, 5.5, 6.1, and 6.3. Incorporates formal NIOSH review comments on page 2 (Publication Record), 30 (Table 4-2), 41, 48 (Table 5-6), and 74 in Sections 4.4, 5.2, 5.4, and Reference Section. References were updated on pages 10, 11, 19, 29, 30, 32, 33, 37, 40, 41, 46, 47, 50-52, 57-62, 64, 65, 70, 74-76 in Sections 1.3, 2.3, 4.4, 4.7, 5.0, 5.1, 5.2, 5.4, 6.1, 6.2, 6.3, 6.4, 7.0, and Reference Section. No sections were deleted.
- Approved June 22, 2007 [1 MB (84 pages)]
- Ames Laboratory SEC Petition Evaluation Report, Rev. 0 (January 1, 1942 through December 31, 1970) [332 KB (49 pages)]
June 9, 2011
- Page last reviewed: September 28, 2015
- Page last updated: July 26, 2017
- Content source:
- National Institute for Occupational Safety and Health Division of Compensation Analysis and Support