Battelle Laboratories - King Avenue
(Site Profile/Docket Number 206)
Location: Columbus, Ohio
Also Known As: Battelle Columbus Laboratories (BCL), Battelle Memorial Institute (BMI)
Special Exposure Cohort Petition Information
The Special Exposure Cohort (SEC) is a unique category of employees established by the Act (42 CFR Part 83). Claims compensated under the SEC do not have to go through the dose reconstruction process. To qualify for compensation under the SEC, a covered employee must meet specific requirements (e.g., must have at least one of 22 “specified cancers,” and have worked for a specified time period at one of the SEC sites). Classes of employees and work sites can be considered for addition to the SEC through a NIOSH petition process. More information about the Special Exposure Cohort can be found on our Frequently Asked Questions page.
Open/Active SEC Petitions
To date, there are no open/active SEC petitions from Battelle Laboratories – King Avenue.
Class(es) Added to the SEC
- All Atomic Weapons Employees who worked at the King Avenue facility owned by Battelle Laboratories in Columbus, Ohio, during the period from April 16, 1943, through June 30, 1956, for a number of work days aggregating at least 250 work days, occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees included in the Special Exposure Cohort
Note: This class was established from Petition 208 - All Atomic Weapons Employees who worked at the facility owned by the Battelle Laboratories at the King Avenue site in Columbus, Ohio, during the period from July 1, 1956, through December 31, 1970, for a number of work days aggregating at least 250 work days, occurring either solely under this employment, or in combination with work days within the parameters established for one or more other classes of employees included in the Special Exposure Cohort
Note: This class was established from Petition 229
Petitions Qualified for Evaluation
Below is a list of the petitions that qualified for evaluation. Select a petition on the list to view the table for that particular petition.
Petition 208 (Apr 16, 1943 to Jun 30, 1956)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received | October 26, 2012 |
Date Qualified for Evaluation | October 29, 2012 |
Summary of Information in Petition |
Job Titles and/or Job Duties: All Atomic Weapons Employees who worked at the Battelle Laboratories – King Avenue facility in Columbus, Ohio
Period of Employment: April 16, 1943 through June 30, 1956 Note: The information above is what qualified for evaluation. During our evaluation of whether dose reconstructions can adequately be completed for the above job titles and period of employment, information may cause NIOSH to change some the dates or job titles/duties. Therefore, as this petition proceeds through the SEC petition process and if an SEC class is proposed, the proposed class may not exactly match the above information. |
Copy of the Petition Received | October 25, 2012 [139 KB (2 pages)] |
Federal Register Notice Announcing that a Battelle Laboratories – King Avenue SEC Petition has met the Minimum Qualifications for Review and Evaluation | November 8, 2012 [87 KB (1 page)] |
SEC Petition Evaluation Report | November 19, 2012 [302 KB (47 pages)] |
Evaluation Report Sent to the Advisory Board | November 19, 2012 |
Petition Discussed by the Advisory Board | The Advisory Board discussed this petition on December 11, 2012, during its regular meeting.
Note: Agendas and transcripts for Board meetings will be posted on the Advisory Board and Public Meetings page as soon as they become available. |
Advisory Board Recommendation on SEC Petition | January 31, 2013 [39 KB (2 pages)] |
HHS Letters to Congress Regarding the SEC Petition | March 6, 2013 [90 KB (10 pages)] |
HHS Designation of Additional Members to the SEC |
March 6, 2013 [44 KB (5 pages)]
Note: this only applies if the class is added to the SEC. |
Federal Register Notice: Designation of a Class of Employees for Addition to the Special Exposure Cohort | March 26, 2013 [75 KB (1 page)] |
Effective Date for the SEC Class | April 5, 2013 |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort | April 12, 2013 [97 KB (2 pages)] |
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC | April 5, 2013 [36 KB (1 page)] |
Petition 229 (Jul 1, 1956 to Dec 31, 1970)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received | October 27, 2015 |
Date Qualified for Evaluation | November 2, 2015 |
Summary of Information in Petition |
Job Titles and/or Job Duties: All Atomic Weapons Employees who worked at the facility owned by the Battelle Laboratories at the King Avenue site in Columbus, Ohio
Period of Employment: July 1, 1956 through December 31, 1970 Note: The information above is what qualified for evaluation. During our evaluation of whether dose reconstructions can adequately be completed for the above job titles and period of employment, information may cause NIOSH to change some the dates or job titles/duties. Therefore, as this petition proceeds through the SEC petition process and if an SEC class is proposed, the proposed class may not exactly match the above information. |
Copy of the Petition Received |
October 27, 2015 [83 KB (2 pages)]
(July 1, 1956 through December 31, 1970) |
Federal Register Notice Announcing that a Battelle Laboratories – King Avenue SEC Petition has met the Minimum Qualifications for Review and Evaluation |
November 13, 2015 [114 KB (1 page)]
(July 1, 1956 through December 31, 1970) |
SEC Petition Evaluation Report |
November 2, 2015 [300 KB (41 pages)] (July 1, 1956 through December 31, 1970) |
Evaluation Report Sent to the Advisory Board | November 6, 2015 (July 1, 1956 through December 31, 1970) |
Petition Discussed by the Advisory Board | The petition was discussed by the Advisory Board on November 18, 2015, during its regular meeting.
Note: Agendas and transcripts for Board meetings will be posted on the Advisory Board and Public Meetings page as soon as they become available. |
Advisory Board Recommendation on SEC Petition |
January 15, 2016 [65 KB (2 pages)] (July 1, 1956 through December 31, 1970) |
HHS Letters to Congress Regarding the SEC Petition |
February 18, 2016 [188 KB (13 pages)] (July 1, 1956 through December 31, 1970) |
HHS Designation/Determination of Additional Members to the SEC |
February 18, 2016 [176 KB (5 pages)] (July 1, 1956 through December 31, 1970) |
Federal Register Notice: Designation/Determination Concerning a Petition to Add a Class of Employees to the Special Exposure Cohort |
Designation:
Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC. |
Effective Date for the SEC Class | March 19, 2016 (July 1, 1956 through December 31, 1970)Note: this only applies if the class is added to the SEC. |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort |
March 25, 2016 [69 KB (2 pages)] (July 1, 1956 through December 31, 1970)Note: this only applies if the class is added to the SEC. |
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC |
March 21, 2016 [66 KB (1 page)] (July 1, 1956 through December 31, 1970)Note: this only applies if the class is added to the SEC. |
Technical Documents
If the energy employee’s personal radiation information is incomplete, NIOSH will use other sources to estimate the radiation dose. This may involve using technical documents called Site Profiles, Technical Basis Documents, and Technical Information Bulletins.
Site Profile
- Site Profile for Battelle Memorial Institute, King Avenue and West Jefferson Sites, Columbus, Ohio [2.3 MB (124 Pages)]
March 26, 2010
Advisory Board and NIOSH Discussions on Battelle Laboratories – King Avenue
The Battelle Laboratories – King Avenue discussion papers listed below are working documents prepared by NIOSH or its contractor for use in discussions with the Advisory Board on Radiation and Worker Health or its Working Groups or Subcommittees. Draft, preliminary, interim, and white paper documents are not final NIOSH or Advisory Board (or their technical support and review contractors) positions unless specifically marked as such. These documents represent preliminary positions taken on technical issues prepared by NIOSH or its contractor.
The discussion papers have been reviewed to identify and redact any information that is protected by the Privacy Act 5 USC §552a and have been cleared for distribution.
- NIOSH/DCAS Presentation: Battelle Memorial Institute (King Avenue) SEC Petition Evaluation Report for Petition 208 (Full Color Version) [462 KB (26 pages)]
December 11, 2012 - NIOSH/DCAS Presentation: Battelle Memorial Institute (King Avenue) SEC Petition Evaluation Report for Petition 208 (Black & White Version) [807 KB (26 pages)]
December 11, 2012
Public Comments on Battelle Laboratories – King Avenue Documents
How to Submit Comments
Comments on Battelle Laboratories – King Avenue Documents can be submitted to the NIOSH Docket Officer electronically by email at nioshdocket@cdc.gov or printed comments can be mailed to:
NIOSH Docket Office
Robert A. Taft Laboratories, MS-C34
1090 Tusculum Avenue
Cincinnati, OH 45226
Please include the Site Profile/Docket Number (206) on all comments.
Comments Received
No comments on Battelle Laboratories – King Avenue have been received at this time.
- Page last reviewed: September 28, 2015
- Page last updated: August 16, 2017
- Content source:
- National Institute for Occupational Safety and Health Division of Compensation Analysis and Support