The Special Exposure Cohort (SEC) is a unique category of employees established by The Act (42 CFR Part 83). Claims compensated under the SEC do not have to go through the dose reconstruction process. To qualify for compensation under the SEC, a covered employee must meet specific requirements (e.g., must have at least one of 22 “specified cancers,” and have worked for a specified time period at one of the SEC sites). Classes of employees and work sites can be considered for addition to the SEC through a NIOSH petition process. More information about the Special Exposure Cohort can be found on our Frequently Asked Questions page.
Open/Active SEC Petitions
There is currently one open/active SEC petition from Rocky Flats Plant. Petition 192 was qualified for evaluation. It will receive a full evaluation by NIOSH, the Advisory Board on Radiation and Worker Health, and the Secretary of the Department of Health and Human Services.
Class(es) Added to the SEC
- April 1, 1952 through December 31, 1958: Employees of DOE, its predecessor agencies, or DOE contractors or subcontractors who were monitored or should have been monitored for neutron exposures while working at the Rocky Flats Plant in Golden, Colorado, for a number of work days aggregating at least 250 work days from April 1, 1952, through December 31, 1958, or in combination with work days within the parameters established for one or more other classes of employees in the SEC.
Note: This class was established from Petition 30
- January 1, 1959 through December 31, 1966: Employees of DOE, its predecessor agencies, or DOE contractors or subcontractors who were monitored or should have been monitored for neutron exposures while working at the Rocky Flats Plant in Golden, Colorado, for a number of work days aggregating at least 250 work days from January 1, 1959, through December 31, 1966, or in combination with work days within the parameters established for one or more other classes of employees in the SEC.
Note: This class was established from Petition 30
- April 1, 1952 through December 31, 1983: All employees of the Department of Energy, its predecessor agencies, and their contractors and subcontractors who worked at the Rocky Flats Plant in Golden, Colorado, from April 1, 1952, through December 31, 1983, for a number of work days aggregating at least 250 work days, occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees included in the Special Exposure Cohort.
Note: This class was established from Petition 192
Classes Not Added to the SEC
- DOE employees or its contractor or subcontractor employees at the Rocky Flats plant in Golden, Colorado, who were exposed to radiation dose from 1967 through 2005 and who were exposed to any radiation dose other than neutron dose from 1952 through 1966.
Note: This class was established from Petition 30
Petitions Qualified for Evaluation
Below is a list of the petitions that qualified for evaluation. Select a petition on the list to view the table for that particular petition.
Petition 30 (Apr 1952 to Feb 15, 2005)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received
|
February 15, 2005 |
Date Qualified for Evaluation
|
June 16, 2005 |
Summary of Information in Petition |
Location: Golden, Colorado Job Titles and/or Job Duties: All represented members, past, present, and current, or USWA Local 8031 and its predecessors Period of Employment: April 1952 to February 15, 2005 |
Copy of the Petition Received |
Rocky Flats Plant Petition April 1952 to February 15, 2005 |
Additional Documents Related to the Petition |
|
Federal Register Notice Announcing that a Rocky Flats Plant SEC Petition has met the Minimum Qualifications for Review and Evaluation |
June 29, 2005 [42 KB (1 page)] |
SEC Petition Evaluation Report |
April 7, 2006 [1.6 MB (86 pages)] |
Evaluation Report Sent to the Advisory Board |
April 7, 2006 |
Petition Discussed by the Advisory Board |
The Advisory Board discussed the Rocky Flats Plant petition on April 27, 2006. The Advisory Board continued its discussions on the SEC petition on September 20, 2006, during its regular meeting. An update of the Rocky Flats Plant SEC petition was discussed on February 8, 2007, during an Advisory Board meeting. The Advisory Board discussed the petition on May 3, 2007, June 11, 2007, and June 26, 2008, during its meetings. |
Advisory Board Recommendation on SEC Petition |
|
HHS Letters to Congress Regarding the SEC Petition |
|
HHS Designation/Determination of Additional Members to the SEC |
Designations
Determinations
|
Federal Register Notice: Designation/Determination Regarding a Class of Employees for Addition to the Special Exposure Cohort |
Designations
Determinations
Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC. |
Effective Date for the SEC Class |
September 5, 2007 |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort |
|
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC |
Petition 192 (Jan 1, 1972 to Dec 31, 1989)
Steps in Petition Process: | Petition Details: |
---|---|
Date Received | August 23, 2011 |
Date Qualified for Evaluation | February 9, 2012 |
Summary of Information in Petition |
Location: Golden, Colorado Job Titles and/or Job Duties: All employees of the Department of Energy, its predecessor agencies, and their contractors and subcontractors Period of Employment: January 1, 1972 to December 31, 1989 |
Copy of the Petition Received |
Petition [1.5 MB (25 pages)] |
Federal Register Notice Announcing that a Rocky Flats Plant SEC Petition has met the Minimum Qualifications for Review and Evaluation |
March 1, 2012 [50 KB (1 page)] (January 1, 1972 through December 31, 1989) |
SEC Petition Evaluation Report |
Rocky Flats Plant SEC Petition Evaluation Report, Rev. 01 (April 1, 1952 to December 31, 2005) [954 KB (135 pages)] Revised September 30, 2013 |
Evaluation Report Sent to the Advisory Board | September 10, 2012 |
Petition Discussed by the Advisory Board |
The Advisory Board discussed this petition on September 18, 2012, and again on October 16, 2013, during its regular meetings. Note: the agenda for this meeting is available on the Advisory Board and Public Meetings page. |
Advisory Board Recommendation on SEC Petition |
November 7, 2013 [34 KB (2 pages)] May 8, 2017 [71 KB (1 page)] |
HHS Letters to Congress Regarding the SEC Petition |
December 12, 2013 [91 KB (11 pages)] (April 1, 1952, through December 31, 1983) |
HHS Designation of Additional Members to the SEC |
December 12, 2013 [40 KB (6 pages)] (April 1, 1952, through December 31, 1983) |
Federal Register Notice: Designation Regarding a Class of Employees for Addition to the Special Exposure Cohort |
December 24, 2013 [80 KB (1 pages)] (April 1, 1952, through December 31, 1983)Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC. |
Effective Date for the SEC Class | January 11, 2014 (April 1, 1952, through December 31, 1983) |
Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort |
January 21, 2014 [72 KB (1 page)] (April 1, 1952, through December 31, 1983) |
Letter to DOL Regarding the Addition of a New Class of Employees to the SEC |
January 14, 2014 [92 KB (1 page)] (April 1, 1952, through December 31, 1983) |
SEC Petitions Not Qualifying for Evaluation
In addition to the petitions listed above, three petitions were received but did not qualify for evaluation.
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Worker Outreach Activities for Rocky Flats Plant:
- May 24, 2012Meeting with Former Workers from the Rocky Flats Plant, Golden, Colorado (First of two meetings)
Final Minutes [208 KB (12 pages)] - May 24, 2012Meeting with Former Workers from the Rocky Flats Plant, Golden, Colorado (Second of two meetings)
Final Minutes [271 KB (20 pages)] - June 23, 2004Meeting with United Steelworkers of America Local 8031
Final Minutes [62 KB (12 pages)] - June 23, 2004Meeting with Colorado State Building and Construction Trades Council
Final Minutes [47 KB (6 pages)]
Advisory Board Work Group on Rocky Flats Plant
This Work Group is responsible for reviewing the Rocky Flats Plant Site Profile, the SEC petition from Rocky Flats Plant petitioners, the NIOSH Evaluation Report of the petition, the SC&A Review of the Rocky Flats Plant Site Profile, considering issues raised by the Board’s contractor (SC&A) concerning the Site Profile and the petition Evaluation Report, and for assisting NIOSH and SC&A in the resolution of such issues. The Work Group may recommend to the Board, changes in the Site Profile as appropriate. The Work Group should strive to develop a recommendation to the Board on whether a class should be added to the SEC.
Work Group Members:
- David Kotelchuck, PhD, MPH (Chair)
- R. William Field, Ph.D., M.S.
- Wanda I. Munn
- Phillip Schofield
Meeting Information:
- February 9, 2017 Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
10:30 a.m. (Eastern Time)
Meeting Type: Teleconference; Public, No Comment Period
Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Presentations:
Background/Discussion Papers:
- Joint Email Submission from Rocky Flats Plant SEC-00192 Co-petitioner Terrie Barrie and GSI SEC-105, Dow in IL SEC-79, and Texas City SEC-88 Co-petitioner Daniel W. Mckeel, Jr. M.D. [364 KB (7 pages)]
February 6, 2017 - SC&A Draft: SC&A’s Evaluation of NIOSH’s White Paper, “Reassessment of Internal Radiation Dose from Sources at the Rocky Flats Plant Critical Mass Laboratory,” of November 28, 2016 [83 KB (9 pages)]
January 24, 2017 - NIOSH/ORAU: Reassessment of Internal Radiation Dose from Sources at the Rocky Flats Plant Critical Mass Laboratory [1 MB (51 pages)]
November 28, 2016 - NIOSH/ORAU: Existence of Mg-Th Alloy at RFP Based on Worker Statements, Response Paper, Rev. 1 [153 (15 pages)]
August 13, 2014
- Joint Email Submission from Rocky Flats Plant SEC-00192 Co-petitioner Terrie Barrie and GSI SEC-105, Dow in IL SEC-79, and Texas City SEC-88 Co-petitioner Daniel W. Mckeel, Jr. M.D. [364 KB (7 pages)]
- October 28, 2015 Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
10:30 a.m. (Eastern Time)
Meeting Type: Teleconference; Public, No Comment Period
Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- July 14, 2015 Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats Plant
Time/Location:
10:00 a.m. (Eastern Time)
Meeting Type: Teleconference; Public, No Comment Period
Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion/Background Papers:
- SC&A Draft: Review and Commentary on the NIOSH White Paper, “Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues,” Rev. 2 [502 KB (15 pages)]
July 13, 2015 - SC&A Memo: SC&A’s Current Status of Evaluating the RFP Potential Data Falsification, Handling Bioassays, and Document Destruction Issues [339 KB (7 pages)]
July 10, 2015 - SC&A Draft: Review of NIOSH’s White Paper: Assessment of Sealed Radioactive Sources, and Fission and Activation Products as Radiological Exposure Sources in the Rocky Flats Plant Critical Mass Laboratory (Building 886 Cluster), Rev. 0 [382 KB (8 pages)]
Contract Number 211-2014-58081
July 8, 2015 - NIOSH/DCAS White Paper: Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues, Rev. 2 [947 KB (44 pages)]
July 1, 2015 - NIOSH/DCAS Draft White Paper: Evaluation of Petitioner Concerns About Data Falsification and Data Invalidation in RFP Building 123 Based on Worker Allegations and Issues Relating to the FBI Raid, Rev. 3 [563 KB (32 pages)]
June 24, 2015 - NIOSH/DCAS White Paper: Assessment of Sealed Radioactive Sources, and Fission and Activation Products as Radiological Exposure Sources in the Rocky Flats Plant Critical Mass Laboratory (Building 886 Cluster), Rev. 0 [859 KB (24 pages)]
June 9, 2015 - SC&A Memo: SC&A Review of NIOSH White Paper: “Evaluation of the Potential for Internal Dose from Np-237 at the Rocky Flats Plant after 1983,” Rev. 1, January 8, 2015 [503 KB (10 pages)]
May 29, 2015
- SC&A Draft: Review and Commentary on the NIOSH White Paper, “Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues,” Rev. 2 [502 KB (15 pages)]
- March 17, 2015
Meeting of the Advisory Board Work Group on Rocky Flats PlantTime/Location:
9:00 a.m. (Eastern Time)
Meeting Type: Face-to-Face; Public, No Comment Period
Cincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166
Toll-Free: 1-877-222-7570
Fax: 859-586-0266Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
- SC&A Draft: SC&A’s Evaluation of NIOSH’s May 30, 2014, Response to the RFP ORISE Health Surveillance Document Review [155 KB (2 pages)]
March 2, 2015 - NIOSH/ORAU White Paper: Response – Rocky Flats Plant Health Surveillance Document Review, Rev. 1 [317 KB (4 pages)]
May 30, 2014 - SC&A Memo: Response to NIOSH Regarding the Existence of Mg-Th Alloy at Rocky Flats Plant [108 KB (4 pages)]
September 11, 2014 - NIOSH/ORAU: Existence of Mg-Th Alloy at RFP Based on Worker Statements, Response Paper, Rev. 1 [153 (15 pages)]
August 13, 2014 - NIOSH/ORAU Draft White Paper: Evaluation of the Potential for Internal Dose from Np-237 at the Rocky Flats Plant After 1983, Rev. 1 [863 KB (12 pages)]
January 8, 2015 - SC&A Draft: Response to NIOSH White Paper: “Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues” dated May 30, 2014, Rev. 0 [590 KB (37 pages)]
September 18, 2014 - NIOSH/ORAU White Paper: Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues, Rev. 1 [409 KB (42 pages)]
May 30, 2014
- SC&A Draft: SC&A’s Evaluation of NIOSH’s May 30, 2014, Response to the RFP ORISE Health Surveillance Document Review [155 KB (2 pages)]
- September 12, 2013
Meeting of the Advisory Board’s Work Group on the Rocky Flats PlantTime/Location:
9:00 a.m. Eastern Standard Time (EST)
Meeting type: Open to Public; No Public Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: (859) 586-0166
Toll-Free: 1-877-222-7570Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
- NIOSH/DCAS Presentation: Rocky Flats Plant Special Exposure Cohort (SEC) Petition 00192 Follow-up Status
September 12, 2013 - SC&A Draft White Paper: Focused Review of “Follow-up Efforts on SEC-00192 RFP Tritium Issues” [649 KB (15 pages)]
September 10, 2013 - SC&A Memo: Review of RFP Data Falsification Issue [142 KB (1 page)]
September 4, 2013
- NIOSH/DCAS Presentation: Rocky Flats Plant Special Exposure Cohort (SEC) Petition 00192 Follow-up Status
- July 8, 2013
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
10:30 a.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
- February 20, 2013–MEETING TYPE/TIME CHANGE
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
10:00 a.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- November 3, 2011
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
2:00 p.m. Eastern Standard Time (EST)–MEETING TIME CHANGED
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Paper:
- July 20, 2009
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
10:00 a.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- An agenda will be provided at a later date.
- Transcript [200 KB (89 pages)]
- June 17, 2008
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
2:30 p.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- An agenda will be provided at a later date.
- Transcript [295 KB (60 pages)]
- April 3, 2008
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
11:00 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- An agenda will be provided at a later date.
- Transcript [273 KB (74 pages)]
- March 17, 2008
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
11:00 a.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- An agenda will be provided at a later date.
- Transcript [283 KB (76 pages)]
- November 26, 2007
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
10:00 a.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- An agenda will be provided at a later date.
- Transcript [148 KB (38 pages)]
- April 30, 2007
Advisory Board Work Group Teleconference MeetingTime/Location:
12:00 p.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: To discuss Rocky Flats.
- Transcript [617 KB (153 pages)]
- April 19, 2007
Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
9:30 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: (859) 586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: This meeting has been scheduled to discuss Rocky Flats.
- Transcript [992 KB (280 pages)]
- March 7, 2007
Meeting of the Advisory Board’s Work Group on Rocky Flats PlantTime/Location:
9:30 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Hilton
7373 Turfway Road
Florence, KY 41042
Phone: (859) 371-4400Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: This meeting has been scheduled to discuss the Rocky Flats SEC petition.
- Transcript [953 KB (269 pages)]
- January 26, 2007
Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
10:00 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Drive
Hebron, KY 41048
Phone: (865) 481-2468Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: This meeting has been scheduled to discuss the Rocky Flats SEC petition.
- Transcript [953 KB (274 pages)]
- January 9, 2007
Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats Plant10:30 a.m. Pacific Standard Time (PST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: To discuss the Rocky Flats SEC petition.
- Transcript [460 KB (125 pages)]
- December 11, 2006 Rocky Flats Work Group Meeting
Time/Location:
9:30 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodHoliday Inn Select
1801 N. Naper Blvd.
Naperville, IL 60563
Phone: (630) 505-4900Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- November 6, 2006
Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
10:00 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodHoliday Inn Cincinnati Airport
1717 Airport Exchange Blvd.
Erlanger, KY 41018
Phone: (859) 371-2233Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: This meeting has been scheduled to discuss the NTS Site Profile review.
- Transcript [1.5 MB (387 pages)]
- August 31, 2006
Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
9:30 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodHoliday Inn Cincinnati Airport
1717 Airport Exchange Blvd.
Erlanger, KY 41018
Phone: (859) 371-2233Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: This meeting has been scheduled to discuss the Rocky Flats SEC petition.
- Transcript [1.5 MB (367 pages)]
- July 26, 2006
Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
9:30 a.m. Eastern Standard Time (EST)
Meeting type: Face-to-Face; Open to Public; No Public Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: (859) 586-0166Teleconference: +1-866-659-0537
Participant Code: 993370Available Meeting Items:
- Agenda: This meeting has been scheduled to discuss the Rocky Flats SEC petition.
- Transcript [1.5 MB (381 pages)]
- May 30, 2006
Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
10:00 a.m. Eastern Standard Time (EST)
Meeting type: Face-to-Face; Open to Public; No Public Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: (859) 586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: This meeting has been scheduled to discuss the Rocky Flats SEC petition.
- Transcript [1 MB (276 pages)]
- April 20, 2006
Teleconference Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
11:00 a.m. Eastern Standard Time (EST)
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda items for discussion include the Y-12 and Rocky Flats SEC petitions.
- Transcript [1.2 MB (311 pages)]
- April 11-12, 2006
Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
Tuesday: 9:00 a.m. Eastern Standard Time (EST)
Wednesday: 10:00 a.m. Eastern Standard Time (EST) Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: (859) 586-0166NOTE: The Work Group Chairs have decided that they will lead these discussions by teleconference. Information on how to connect to the teleconference is listed below. As a result of the late change in plans for this meeting, the meeting room at the Cincinnati Airport Marriott will be open for meeting attendees and the public who have planned to attend the meeting in Cincinnati. The meeting room will be connected to the teleconference.
Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: Tuesday, April 11 – SEC Procedures, Review of the Y-12 Site Profile
- Agenda: Wednesday, April 12 – Review of the Rocky Flats Plant Site
- Transcript: April 11 (SEC Procedures) [256 KB (55 pages)]
- Transcript: April 11 (Y-12 Site Profile) [603 KB (173 pages)]
- Transcript: April 12 (Rocky Flats Plant Site) [1.2 MB (347 pages)]
- March 27-28, 2006 Meeting of the Work Group of the Advisory Board on Radiation and Worker Health
Time/Location:
Monday, March 27: 1:00 p.m. Eastern Standard Time (EST)
Tuesday, March 28: 10:00 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: (859) 586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda: Monday Topic for Discussion: Review of Y-12 Site Profile and SEC issues.
- Agenda: Tuesday Topic for Discussion: Review of Rocky Flats Plant Site Profile and SEC issues.
- Transcript: March 27 [890 KB (218 pages)]
- Transcript: March 28 [1 MB (259 pages)]
- February 27-28, 2006
Meeting of the Work Group of the Advisory Board on Radiation and Worker HealthTime/Location:
9:00 a.m. Eastern Standard Time (EST)
Meeting Type: Face-to-Face; Public, No Comment PeriodHilton Boston Logan Airport
One Hotel Drive
Boston, MA 02128
Phone: (617) 568-6816Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda for this workgroup meeting will focus on Y-12 and Rocky Flats Plant Site Profiles (Feb. 27th) and individual dose reconstruction reviews and procedures reviews (Feb. 28th).
- Transcript [440 KB (120 pages)]
Pre-Decisional Document Policy
Please note that as part of the procedures and processes of the Advisory Board’s Work Groups, several kinds of pre-decisional documents may be developed. These pre-decisional documents, such as white papers, matrices, working drafts, etc., are distributed among Work Group members as research and background tools to facilitate discussion and deliberation. Although discussion during a public meeting may cover pre-decisional documents, these documents often are not further revised or finalized, and thus do not reflect the final determination or evaluation of the Advisory Board and its Work Groups. Additionally, some pre-decisional documents not otherwise posted on the website may contain sensitive information, which would require an interested party to obtain such documents by filing a Freedom of Information Act (FOIA) request with the CDC/ATSDR FOIA office at foiarequests@cdc.gov.
Technical Documents
If the energy employee’s personal radiation information is incomplete, NIOSH will use other sources to estimate the radiation dose. This may involve using technical documents called Site Profiles, Technical Basis Documents, and Technical Information Bulletins.
Site Profile
- Introduction [93 KB (9 pages)]
Revised November 30, 2006
Revision Includes: Incorporates responses to union comments. Added Section 1.2, Attributions and Annotations. Constitutes a total rewrite of the document. Incorporates internal formal review comments. This revision results in no change to the assigned dose and no PER is required.
- Site Description [1.0 MB (80 pages)]
Revised February 1, 2007
Revision Includes: Approved Revision 01 revised in response to formal OCAS and ORAU comments. Includes additional incidents and occurrences post-1981. This revision addresses Worker Outreach comments as described in CT-0200 and CT-0204, in Section 2.4.5. Revised to consider attribution per ORAU direction and to respond to Union member comments. Incorporates NIOSH formal review comments. No further changes occurred as a result of formal internal review. Constitutes a total rewrite of document. This revision results in no change to the assigned dose and no PER is required.
- Occupational Medical Dose [640 KB (27 pages)]
Revised June 27, 2017
Revision Includes: Updates occupational medical X-ray doses for PFG, AP and LAT lumbar spine, and AP chest examinations. The AP chest examination dose update is specific to those performed starting June 11, 2001. Skin dose guidance and doses are also included in Attachment 1 of this revision based on information presented in ORAUT-OTIB-0006 Rev 04. Additional information regarding the availability of X-ray inventory sheets starting around February 2009 is included. CLL uncertainty parameters have been included as well. Updates Table A-2 to separate skin dose values for PA chest examinations between 1971 and 2001 into two time periods (1971-1984 and 1985-2001). Corrects transcription errors in Table A-1 of 8 skin doses for LAT exams performed prior through 1970 to correctly reflect values listed in ORAUT-OTIB-0006 Rev 04. Incorporates formal internal review comments. No changes occurred as a result of formal NIOSH review. Constitutes a total rewrite of the document.
- Occupational Environmental Dose [1.6 MB (62 pages)]
Revised April 23, 2007
Revision Includes: Update to Section. 4.1.1 with standard NIOSH text, updated intakes to reflect site-wide maximum intakes which required obtaining location-specific model output as opposed to location-averaged output. Converted intake units to Bq, changed recommended AMAD to 0.3 ìm for some years, clarified that resuspension was addressed in modeling. Added CDPHE data for 1999-2005, other clarifications re SC&A comments. Attachment B updated to incorporate ICRP 68 organ dose factors. Worker Outreach comments pertaining to CT-0202 and CT-0208 have been addressed in a revision of Section 4.2.3. Revised to incorporate attribution per ORAU direction. Incorporates NIOSH formal review comments and an additional comment, changing recommendation of 0.3 ìm to 1.0 ìm AMAD for certain years. Constitutes a total rewrite of document. This revision results in an increase in assigned dose and a PER is required.
- Occupational Internal Dose [2.9 MB (177 pages)]
Revised September 30, 2014
Revision Includes: Revision initiated to incorporate Advisory Board comments, the approval of SEC-00192, and new dose reconstruction approaches in assessing tritium, 233U, and recycled uranium. Incorporates additional clarifications on current dose reconstruction guidance. Incorporates formal internal and NIOSH review comments. Constitutes a total rewrite of the document.
- Occupational External Dose [4.6 MB (105 pages)]
Revised October 20, 2010
Revision Includes: Page change initiated to update references and NIOSH required language on pages 10 and 11 in Section 6.1. Corrected text inconsistencies to indicate that non-affected original neutron dose, in addition to NDRP neutron dose, should be used in the reconstruction. Original neutron dose, in addition to notional neutron dose, should not be used in dose reconstruction. These changes occurred in pages 48 and 49 in Section 6.7.3.3. Updated references throughout and on page 65 in the Reference Section. No sections were deleted. No changes occurred as a result of formal internal review. Incorporates formal NIOSH review comments.
Technical Information Bulletins (TIBs)
- ORAUT-OTIB-0058 Rev-01 PC-1: External Coworker Dosimetry Data for Rocky Flats Plant
About this Document: New Technical Information Bulletin to provide information to allow dose reconstructors to assign doses at the Rocky Flats Plant to certain workers who have no or limited monitoring data, based on site coworker data.
Note: This document has been canceled. There is no longer a need to keep this information in a stand-alone document. The information contained in this document has been incorporated into the Rocky Flats Plant Site Profile section: Occupational External Dose.
- ORAUT-OTIB-0038 Rev-00: Internal Dosimetry Coworker Data for Rocky Flats Environmental Technology Site
About this Document: New Technical Information Bulletin for assigning Rocky Flats Environmental Technology Site internal doses based on coworker bioassay data.
Note: This document has been canceled. There is no longer a need to keep this information in a stand-alone document. The information contained in this document has been incorporated into the Rocky Flats Plant Site Profile section: Occupational External Dose.
- OCAS-TIB-014 Rev-00: Rocky Flats Internal Dosimetry Coworker Extension–CANCELED
Approved December 7, 2006About this Document: Extends TIB 38: Internal Dosimetry Coworker Data for Rocky Flats Environmental Technology Site. In order to extend the analysis beyond 1988, data was obtained from the Rocky Flats site’s HIS-20 database. The purpose of this TIB is to extend the previous TIB 38 utilizing the same methodology.
Note: This document has been canceled. There is no longer a need to keep this information in a stand-alone document.The information was incorporated into ORAUT-TKBS-0011-5 Rev 02: Occupational Internal Dose.
- ORAUT-OTIB-0027 Rev-00: Supplementary External Dose Information for Rocky Flats
About this Document: Establishes the technical basis for supplementary external dose information for Rocky Flats Plant.
This document has been canceled. There is no longer a need to keep this information in a stand-alone document. The information contained in this document has been incorporated into the Rocky Flats Plant Site Profile section: Occupational External Dose.
- ORAUT-OTIB-0050 Rev-00:Use of Rocky Flats Neutron Dose Reconstruction Project Data in Dose Reconstructions
About this Document: Establishes the technical basis to establish guidance for the use of Rocky Flats Neutron Dose Reconstruction Project data in dose reconstructions.
Note: This document has been canceled. There is no longer a need to keep this information in a stand-alone document. The information contained in this document has been incorporated into the Rocky Flats Plant Site Profile section: Occupational External Dose.
Advisory Board and NIOSH Discussions on Rocky Flats Plant
The Rocky Flats Plant discussion papers listed below are working documents prepared by NIOSH or its contractor for use in discussions with the Advisory Board on Radiation and Worker Health or its Working Groups or Subcommittees. Draft, preliminary, interim, and white paper documents are not final NIOSH or Advisory Board (or their technical support and review contractors) positions unless specifically marked as such. These documents represent preliminary positions taken on technical issues prepared by NIOSH or its contractor.
The discussion papers have been reviewed to identify and redact any information that is protected by the Privacy Act 5 USC §552a and have been cleared for distribution.
- Advisory Board: Rocky Flats Plant SEC-00192 [135 KB (41 pages)]
Presentation at the March 22-23, 2017, Meeting of the Advisory Board on Radiation and Worker Health - SC&A Memo: OCAS-TIB-0014 Finding from Subcommittee for Procedure Reviews [41 KB (1 page)]
March 2, 2017 - NIOSH/DCAS Presentation: Reassessment of Internal Radiation Dose at the Rocky Flats Plant Critical Mass Laboratory SEC–0192 [207 KB (15 pages)]
Presented at the February 9, 2017, Teleconference Meeting of the Advisory Board’s Work Group on Rocky Flats Plant - SC&A Draft: SC&A’s Evaluation of NIOSH’s White Paper, “Reassessment of Internal Radiation Dose from Sources at the Rocky Flats Plant Critical Mass Laboratory,” of November 28, 2016 [83 KB (9 pages)]
January 24, 2017 - NIOSH/ORAU: Reassessment of Internal Radiation Dose from Sources at the Rocky Flats Plant Critical Mass Laboratory [1 MB (51 pages)]
November 28, 2016 - SC&A Memo: Responses to Revision 3 of NIOSH’S (“Follow-up Efforts on SEC-00192, Rocky Flats Plant Tritium Issues, White Paper,” December 28, 2015) [262 KB (27 pages)]
June 6, 2016 - NIOSH/ORAU White Paper: Follow-up Efforts on SEC-00192, Rocky Flats Plant Tritium Issues,
Rev. 3 [329 KB (45 pages)]
December 28, 2015 - NIOSH/ORAU White Paper: NIOSH Evaluation of the Rocky Flats SEC Petitioners’ Response to NIOSH’s White Paper, Evaluation of Petitioner Concerns About Data Falsification and Data Invalidation in RFP Building 123 Based on Worker Allegations and Issues Relating to the FBI Raid, Rev. 0 [126 KB (9 pages)]
November 30, 2015 - SC&A Memo: Responses to 17th Set Blind Remaining Issues [55 KB (2 pages)]
November 24, 2015 - Advisory Board Presentation: Rocky Flats Plant SEC Petition 192 (1984-1989, Golden CO) Update [202 KB (35 pages)]
Presented at the November 18-19, 2015, Meeting of the Advisory Board on Radiation and Worker Health - NIOSH/ORAU White Paper: Evaluation of Petitioner Concerns About Data Falsification and Data Invalidation in RFP Building 123 Based on Worker Allegations and Issues Relating to the FBI Raid, Rev. 4 [286 KB (32 pages)]
August 12, 2015 - SC&A Draft: Review and Commentary on the NIOSH White Paper, “Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues,” Rev. 2 [502 KB (15 pages)]
July 13, 2015 - SC&A Memo: SC&A’s Current Status of Evaluating the RFP Potential Data Falsification, Handling Bioassays, and Document Destruction Issues [339 KB (7 pages)]
July 10, 2015 - SC&A Draft: Review of NIOSH’s White Paper: Assessment of Sealed Radioactive Sources, and Fission and Activation Products as Radiological Exposure Sources in the Rocky Flats Plant Critical Mass Laboratory (Building 886 Cluster), Rev. 0 [382 KB (8 pages)]
Contract Number 211-2014-58081
July 8, 2015 - NIOSH/DCAS White Paper: Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues, Rev. 2 [947 KB (44 pages)]
July 1, 2015 - NIOSH/DCAS Draft White Paper: Evaluation of Petitioner Concerns About Data Falsification and Data Invalidation in RFP Building 123 Based on Worker Allegations and Issues Relating to the FBI Raid, Rev. 3 [563 KB (32 pages)]
June 24, 2015 - SC&A Memo: Major Differences in the three Dose Reconstruction Methods and their Resolution or Course of Action regarding Rocky Flats Plant Case #[Redact] [239 KB (3 pages)]
June 16, 2015 - NIOSH/DCAS White Paper: Assessment of Sealed Radioactive Sources, and Fission and Activation Products as Radiological Exposure Sources in the Rocky Flats Plant Critical Mass Laboratory (Building 886 Cluster), Rev. 0 [859 KB (24 pages)]
June 9, 2015 - SC&A Memo: SC&A Review of NIOSH White Paper: “Evaluation of the Potential for Internal Dose from Np-237 at the Rocky Flats Plant after 1983,” Rev. 1, January 8, 2015 [503 KB (10 pages)]
May 29, 2015 - SC&A Draft: Comparison of SC&A’S Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Rocky Flats Plant, Rev. 1 [893 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACT], Revision 1
April 16, 2015 - SC&A Draft: Comparison of SC&A’s Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Rocky Flats Plant, Rev. 0 [1 MB (54 pages)]
April 13, 2015 - SC&A Draft: SC&A’s Evaluation of NIOSH’s May 30, 2014, Response to the RFP ORISE Health Surveillance Document Review [155 KB (2 pages)]
March 2, 2015 - SC&A Draft: Comparison of SC&A’S Blind Dose Reconstruction to NIOSH’s Dose Reconstruction of Case #[Redact] from the Rocky Flats Plant, Rev. 0 [601 KB (26 pages)]
Contract No. 211-2014-58081
SCA-TR-DRC2015-CN[REDACT]
February 13, 2015 - NIOSH/DCAS Draft White Paper: Evaluation of the Potential for Internal Dose from Np-237 at the Rocky Flats Plant After 1983, Rev. 1 [863 KB (12 pages)]
January 8, 2015 - NIOSH/DCAS Draft White Paper: Evaluation of the Potential for Internal Dose from Np-237 at the Rocky Flats Plant After 1983, Rev. 0 [390 KB (9 pages)]
December 30, 2014 - SC&A Draft: Response to NIOSH White Paper: “Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues” dated May 30, 2014, Rev. 0 [590 KB (37 pages)]
September 18, 2014 - SC&A Memo: Response to NIOSH Regarding the Existence of Mg-Th Alloy at Rocky Flats Plant [108 KB (4 pages)]
September 11, 2014 - NIOSH/ORAU: Existence of Mg-Th Alloy at RFP Based on Worker Statements, Response Paper, Rev. 1 [153 (15 pages)]
August 13, 2014 - NIOSH/ORAU White Paper: Response – Rocky Flats Plant Health Surveillance Document Review, Rev. 1 [317 KB (4 pages)]
May 30, 2014 - NIOSH/ORAU White Paper: Follow-up Efforts on SEC-00192 Rocky Flats Plant Tritium Issues, Rev. 1 [409 KB (42 pages)]
May 30, 2014 - SC&A Draft: SC&A’s Dose Reconstruction of Case #[Redacted] from the Rocky Flats Plant [1 MB (41 pages)]
Contract No. 200-2009-28555
SCA-TR-BDR2014-CN[Redacted]
January 13, 2014 - SC&A Draft: Review of Part II, Rocky Flats Tritium Dose Assignment for 1973, Attachment A [658 KB (21 pages)]
December 11, 2013 - NIOSH/DCAS Presentation: Rocky Flats Plant Special Exposure Cohort (SEC) Petition Evaluation, Petition 192
October 16, 2013 - Advisory Board Presentation: Rocky Flats Plant SEC Petition Evaluation Report Review, Petition 192 [80 KB (6 pages)]
- SC&A Memo: Update of SC&A’s Review of RFP Documents for Data Falsification [254 KB (3 pages)]
October 9, 2013 - NIOSH/DCAS Presentation: Rocky Flats Plant Special Exposure Cohort (SEC) Petition 192 Follow-up Status
September 12, 2013 - SC&A Draft White Paper: Focused Review of “Follow-up Efforts on SEC-00192 RFP Tritium Issues” [649 KB (15 pages)]
September 10, 2013 - SC&A Memo: Review of RFP Data Falsification Issue [142 KB (1 page)]
September 4, 2013 - NIOSH/DCAS Presentation: Rocky Flats Plant SEC-00192 Update
July 16, 2013 - NIOSH/DCAS White Paper: Follow-up Efforts on SEC-00192 RFP Tritium Issues [720 KB (38 pages)]
June 25, 2013 - NIOSH/DCAS White Paper: Evaluation of Petitioner Concerns About Data Falsification and/or Data Invalidation in RFP Building 123 Based on Worker Allegations [412 KB (8 pages)]
June 10, 2013 - SC&A Draft Report to the Subcommittee on Dose Reconstruction: Summary of Findings Matrix (10th–13th Sets: RFP/LANL Cases) [369 KB (32 pages)]
November 21, 2012 - NIOSH Presentation: Rocky Flats Plant SEC Petition (1972-1989) [303 KB (25 pages)]
September 18, 2012 - SC&A Draft: Preliminary Draft sections of SC&A’s Rocky Flats SEC Petition Evaluation Report Review report sections for Work Group review and discussions:
- Draft: Review of the Rocky Flats Plant Special Exposure Cohort Petition, SEC-00030. Volume 1: Main Report [1.5 MB (231 pages)]
April 5, 2007 - Draft: Review of the Rocky Flats Plant Special Exposure Cohort Petition, SEC-00030. Volume 2: Attachments [11 MB (537 pages)]
April 27, 2007 - Revised Draft: Supplemental Report on Neutron Doses at Rocky Flats, 1952 to 1970 [606 KB (91 pages)]
April 30, 2007 - Draft: Second Supplemental Report on the Rocky Flats SEC Petition [566 KB (66 pages)]
June 1, 2007 - Draft: Other Radionuclides (including Thorium) [152 KB (21 pages)]
February 15, 2007 - Draft: Data Completeness Evaluation [96 KB (10 pages)]
February 15, 2007 - Draft: Completeness of Records for 1969 and 1970 [509 KB (20 pages)]
February 15, 2007 - Draft: Safety Concerns [205 KB (35 pages)]
February 15, 2007 - Draft: Data Integrity Examples Analysis–This document is currently being updated and will be reposted once the update is complete.
- Draft: Logbook Analysis [106 KB (18 pages)]
January 18, 2007
- Draft: Review of the Rocky Flats Plant Special Exposure Cohort Petition, SEC-00030. Volume 1: Main Report [1.5 MB (231 pages)]
- Rocky Flats Site Profile Review: Matrix of Priority Issues Potentially Relevant to SEC Petition Review [92 KB (15 pages)]
January 8, 2007 - Draft: Rocky Flats Plant Site Profile Review [2.7 MB (263 pages)]
Contract No. 200-2004-03805
Task Order No. 1
SCA-TR-TASK1-0008
December 8, 2005 - Attachment 2: Site Expert Interview Summary [250 KB (24 pages)]
Program Evaluation Plans (PEPs) and Program Evaluation Reports (PERs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the new information may result in an increase in dose for a completed dose reconstruction with a probability of causation of less than 50%, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
- OCAS-PER-0010 Rev-00: Program Evaluation Report: The Effect of Rocky Flats Neutron Dose Reconstruction Project Data [21 KB (2 pages)]
April 13, 2007
About this Document: New document to report the impact of data received from the Rocky Flats Plant Neutron Dose Reconstruction Project.
Summary: Neutron doses at Rocky Flats were re-evaluated as part of the Rocky Flats Neutron Dose Reconstruction Project (NDRP). These records were provided to OCAS as part of the individual dosimetry records. The application of the NDRP data to dose reconstructions is described in ORAUT-OTIB-0050, Rev. 00.
- OCAS-PER-0021 Rev-00: Program Evaluation Report: Rocky Flats Plant Dose Reconstruction Method Modifications [14 KB (1 page)]
September 20, 2007
About this Document: New document to determine which previously completed claims require evaluation for the effect of revising Rocky Flats Plant TBDs and TIBs.
Summary: The Department of Labor indicated they will return all claims to NIOSH that were not determined to be a member of the SEC. Therefore, no evaluation of the modifications to dose reconstruction methodology is necessary. NIOSH will complete a new dose reconstruction for all claims returned by DOL using the current methodology. It should be noted that some of these claims will be unaffected by these modifications and some dose reconstructions may decrease as a result of removing dose associated with the SEC basis.
The last document to be revised to incorporate changes as a result of the SEC deliberation and designation was the external dose section of the Rocky Flats Technical Basis Document. This document was revised on August 17, 2007. Therefore, the returned claims should consist only of those approved prior to that date. This totals 590 claims, some of which NIOSH previously requested a return based on other PERs.
Miscellaneous Documents
- Letter from Senator Barack Obama to Elizabeth White (DOE) requesting documentation related to the relationship between the former Dow Chemical Company, the Atomic Energy Commission, and the Rocky Flats Plant. [50 KB (3 pages)]
- Letter from Roger Anders (DOE) to Larry Elliott regarding information in DOE’s response to Senator Barack Obama’s letter to Elizabeth White (DOE) requesting documentation related to the relationship between the former Dow Chemical Company, the Atomic Energy Commission, and the Rocky Flats Plant for an Advisory Board meeting. [46 KB (2 pages)]
Folder 1
- Pages 1-32 [2.8 MB (32 pages)]
- Pages 33-65 [2.6 MB (33 pages)]
- Pages 66-98 [2.7 MB (33 pages)]
- Pages 99-131 [2.2 MB (33 pages)]
Folder 2
- Pages 1-53 [2.8 MB (53 pages)]
- Pages 54-107 [3.5 MB (54 pages)]
- Pages 108-161 [4.0 MB (54 pages)]
- Pages 162-213 [3.4 MB (52 pages)]
Folder 3
- Pages 1-59 [2.7 MB (59 pages)]
- Pages 60-119 [4.0 MB (60 pages)]
- Pages 120-179 [3.9 MB (60 pages)]
- Pages 180-239 [3.5 MB (60 pages)]
- Pages 240-299 [3.9 MB (60 pages)]
Folder 4
- Letter from Roger M. Anders (DOE) to Larry Elliott with enclosures containing the contract that the Atomic Energy Commission signed with the Dow Chemical Company for the operation of the Rocky Flats Plant. [94 KB (1 page)]
Agreement for a Skilled Craft Training Program. Formulated and Developed by the Dow Chemical Company Rocky Flats Division and the Denver Metal Trades Council, AFL, Denver, Colorado.
Contract Between the United States of America and the Dow Chemical Company, Contract AT(29-1)-1106
Public Comments on Rocky Flats Plant Documents
How to Submit Comments
Comments on Rocky Flats Plant Documents can be submitted to the NIOSH Docket Officer electronically by email at nioshdocket@cdc.gov or printed comments can be mailed to:
NIOSH Docket Office
Robert A. Taft Laboratories, MS-C34
1090 Tusculum Avenue
Cincinnati, OH 45226
Please include the Site Profile/Docket Number (032) on all comments.
Comments Received
-
April 25, 1996, DOE Memo on the Moratorium on the Destruction of Records [67 KB (1 page)]
-
December 21, 1973 DOE News Article, A.E.C. Dow discredit reporting of tritium study [79 KB (1 page)]
-
NIOSH Meeting Regarding Exposure Statements [198 KB (4 pages)]
-
DOE Memo on the Moratorium on the Destruction of Records [51 KB (1 page)]
-
DOE News Articles and other Miscellaneous Documents [886 KB (21 pages)]
-
Submission from Terrie Barrie, Rocky Flats SEC-00192 Co-petitioner [155 KB (5 pages)]
December 9, 2016 -
Submission from Jon Lipsky, M.A.S., regarding data falsification and invalidation at the Rocky Flats Plant [81 KB (2 pages)]
November 18, 2015 -
Submission from Terrie Barrie, Rocky Flats SEC-00192 Co-petitioner [2 MB (21 pages)]
July 18, 2013 -
Comments from Private Person regarding Rocky Flats workers [445 KB (2 pages)]
August 22, 2007 -
Comments from Private Person regarding SC&A’s review of Rocky Flats SEC-00030 petition [68 KB (1 page)]
April 18, 2007
Document Archive for Rocky Flats Plant
- Site Profile
- Introduction [37 KB (7 pages)]
Approved April 20, 2004
- Site Description [920 KB (58 pages)]
Approved January 10, 2004
- Occupational Medical Dose
- Revised April 23, 2007 [476 KB (20 pages)]
Revision Includes: Initiated to revise Table 3.4.2-2 (now Table 3- 6), text, and dose estimate tables to be consistent with ORAUTOTIB- 0006 Rev 03 PC-1. Revised Table 3.2-1 (now Table 3-1) and text to specify the inclusion of termination X-rays for the period of 1952-1986. Revised Table 3.4.1-2 (now Table 3-5) per commitment tracking form dated 02/06/2006. Revised to include attribution information per ORAU direction. The Worker Outreach comment from CT-0203 was addressed. Worker outreach comment from the June 23, 2004, meeting of the United Steelworkers of America Local 8031 and Rocky Flats Security Officers Local Union 1 was addressed in Section 3.1. Incorporates formal internal and NIOSH review comments. Constitutes a total rewrite of document. This revision results in an increase in assigned dose and a PER is required.
- Approved February 9, 2004 [227 KB (27 pages)]
About this Document: New Technical Basis Document for the Rocky Flats Plant – Occupational Medical Dose. Incorporates NIOSH review comments. First approved issue.
- Revised April 23, 2007 [476 KB (20 pages)]
- Occupational Environmental Dose
- Revised June 29, 2004 [664 KB (56 pages)]
Revision Includes: NIOSH material added to Introduction; Table 4-1 Columns corrected; Table 4-2 values corrected; P. 50 table list change; Sect. B.2 3H dose factor discussion added; P. 52 table ID changed. Averaged two 1973 Pu and Am intake values to provide one annual estimate; changed FEIS reference citation on p. 8, and corrected reference list for 2 citations.
- Site Profile: Occupational Environmental Dose section [659 KB (56 pages)]]
Approved January 6, 2004
- Revised June 29, 2004 [664 KB (56 pages)]
- Site Profile: Occupational Internal Dose
- Revised August 17, 2007 [2.3 MB (162 pages)]
Revision Includes: Initiated to capture Advisory Board comments associated with the June 2007 Advisory Board meeting. Incorporation of thorium and internal coworker from ORAUT-OTIB-0038 and OCAS-TIB-014. Incorporates formal internal and NIOSH review comments.
- Revised February 1, 2007 [1.7 MB (123 pages)]
Revision Includes: Approved Revision 01 revised to reflect current introductory material. Revised in response to Union comments. Change made to Table 5- 9. Constitutes a total rewrite of document. This revision addresses Worker Outreach comments as described in CT-0201, CT-0206, and CT-0207. Revised to incorporate attribution, per ORAU request. The Worker Outreach comments from the June 23, 2004, meeting of the United Steelworkers of America Local 8031 and Rocky Flats Security Officers Local Union 1 are addressed in Section 5.3.2 and 5.4.2 regarding internal organ counts; Sections 5.2.1.2, 5.2.2.2, 5.2.3.2., and 5.2.4.2 regarding particle size and that as many reports as possible have been reviewed in the writing of this section. The Worker Outreach comments from the June 23, 2004, meeting of Colorado State Building and Construction Trades regarding whole body counting are addressed in Sections 5.3.2 and 5.2.4. Incorporates internal and NIOSH formal review comments. This revision results no change to the assigned dose and no PER is required.
- Page Change Revision December 13, 2005 [1.5 MB (103 pages)]
Revision Includes: Page change initiated to incorporate recent direction from NIOSH to include DOL review comments on page 7 in Section 5.1. Change made to Table 5.3.1.4.2-2 on page 17 in Section 5.3. No sections were deleted.
- Approved January 12, 2004 [1.5 MB (102 pages)]
- Revised August 17, 2007 [2.3 MB (162 pages)]
- Occupational External Dose
- Revised August 14, 2007 [1.5 MB (105 pages)]
Revision Includes: Initiated to capture Advisory Board comments associated with the June 2007 Advisory Board meeting. The following OTIBs have been incorporated into this document during this revision: ORAUT-OTIB-0027, ORAUT-OTIB-0050, and ORAUTOTIB- 0058. Incorporates formal internal and NIOSH review comments.
- Revised February 8, 2007 [1.4 MB (90 pages)]
Revision Includes: Approved Revision to incorporate NIOSH-requested material, responses to questions by dose reconstructors, responses to Advisory Board on Radiation and Worker Health review, and attribution of certain statements in document. Constitutes a total rewrite of document. Added Section 6.11, Attributions and Annotations. Worker Outreach comments pertaining to CT-0205 and CT-0209 have been addressed. Incorporates internal and NIOSH formal review comments. The Worker Outreach comments from the June 23, 2004, meeting of the United Steelworkers of America Local 8031 and Rocky Flats Security Officers Local Union 1 are addressed as follows: Lead aprons and port covers, Section 6.5.5; Neutron Dose Reconstruction Project, Sections 6.3.5.2, 6.4.2, and 6.7.3.4; and exposure geometry and gloveboxes, Sections 6.5, 6.6.4, 6.7.4, and 6.8.4. This revision results in an increase in assigned dose and a PER is required.
- Approved January 20, 2004 [1.3 MB (68 pages)]
- Revised August 14, 2007 [1.5 MB (105 pages)]
- Introduction [37 KB (7 pages)]
- Technical Information Bulletin: Rocky Flats Internal Dosimetry Coworker Extension
- OCAS-TIB-014 Rev-00, December 7, 2006 [109 KB (17 pages)]
- About this Document: Extends TIB 38: Internal Dosimetry Coworker Data for Rocky Flats Environmental Technology Site. In order to extend the analysis beyond 1988, data was obtained from the Rocky Flats site’s HIS-20 database. The purpose of this TIB is to extend the previous TIB 38 utilizing the same methodology.
This document has been canceled. There is no longer a need to keep this information in a stand-alone document. The information contained in this document has been incorporated into the Rocky Flats Plant Site Profile section: Occupational External Dose.
- Rocky Flats Plant SEC Petition Evaluation Report (April 1, 1952 to December 31, 2005) [755 KB (70 pages)]
September 5, 2012 - Technical Information Bulletin: External Coworker Dosimetry Data for Rocky Flats Plant
- ORAUT-OTIB-0058 Rev-01 PC-1: Page Change Revision March 29, 2007 [90 KB (16 pages)]
About this Document: New Technical Information Bulletin to provide information to allow dose reconstructors to assign doses at the Rocky Flats Plant to certain workers who have no or limited monitoring data, based on site coworker data.
Page Change Revision Includes: Corrects errors in the steps on pages 9 and 10 of Section 7.0. Step 3 was combined with Step 4 in Rev 01. This resulted in a renumbering of the steps. Step 7 in Rev 01 was redundant and was deleted. Tables 7-3 and 7-6 were removed based on comments from NIOSH. In addition, data for 1969 and 1970 was updated based on an analysis of the HIS-20 dataset with readings of “zero” removed. No further changes occurred as a result of formal internal review. Recalculated coworker dose distributions for 1969-70 in Tables 7.1, 7.2, 7.3. 7.4 on pages 11, 12, 13, and 14. Attributions and Annotations Section was added on page 15. This revision results in no change to the assigned dose and no PER is required.
- ORAUT-OTIB-0058 Rev-01: Revised January 8, 2007 [90 KB (17 pages)]
Page Change Revision Includes: Approved Revision 01 due to the release of ORAUT-OTIB-0052 Rev 00 [288 KB (35 pages)] and comments received from NIOSH. Constitutes a total rewrite of the document. Incorporates internal formal review comments. Incorporates NIOSH formal review comments and additional information found regarding neutron to photon ratios for the period 1970-1976. Added Table 6-2. This revision results in an increase in assigned dose and a PER is required.
- ORAUT-OTIB-0058 Rev-00: Approved May 12, 2006 [135 KB (13 pages)]
- ORAUT-OTIB-0058 Rev-01 PC-1: Page Change Revision March 29, 2007 [90 KB (16 pages)]
- ORAUT-OTIB-0038 Rev-00: Internal Dosimetry Coworker Data for Rocky Flats Environmental Technology Site [285 KB (35 pages)]
Approved August 3, 2006About this Document: New Technical Information Bulletin for assigning Rocky Flats Environmental Technology Site internal doses based on coworker bioassay data.
- ORAUT-OTIB-0027 Rev-00: Supplementary External Dose Information for Rocky Flats [53 KB (9 pages)]
Approved May 19, 2005About this Document: Establishes the technical basis for supplementary external dose information for Rocky Flats Plant.
- ORAUT-OTIB-0050 Rev-00: Use of Rocky Flats Neutron Dose Reconstruction Project Data in Dose Reconstructions [127 KB (10 pages)]
Approved December 13, 2005About this Document: Establishes the technical basis to establish guidance for the use of Rocky Flats Neutron Dose Reconstruction Project data in dose reconstructions.
- Page last reviewed: September 28, 2015
- Page last updated: July 24, 2017
- Content source:
- National Institute for Occupational Safety and Health Division of Compensation Analysis and Support