Skip directly to search Skip directly to A to Z list Skip directly to navigation Skip directly to page options Skip directly to site content

Winchester Engineering and Analytical Center

(Site Profile/Docket Number 253)

Location: Winchester, Massachusetts

Also known as: U.S. Public Health Service; N.E. Radiological Laboratory, Northeastern Radiological Health Laboratory, National Lead Co., AEC Raw Materials Development Laboratory

Special Exposure Cohort Petition Information

The Special Exposure Cohort (SEC) is a unique category of employees established by the Act (42 CFR Part 83). Claims compensated under the SEC do not have to go through the dose reconstruction process. To qualify for compensation under the SEC, a covered employee must meet specific requirements (e.g., must have at least one of 22 “specified cancers,” and have worked for a specified time period at one of the SEC sites). Classes of employees and work sites can be considered for addition to the SEC through a NIOSH petition process. More information about the Special Exposure Cohort can be found on our Frequently Asked Questions page.

Open/Active SEC Petitions

There are currently no open/active SEC petition from Winchester Engineering and Analytical Center.

Class(es) Added to the SEC

  • All employees of the Department of Energy, its predecessor agencies, and their contractors and subcontractors who worked at the Winchester Engineering and Analytical Center in Winchester, Massachusetts, from January 1, 1952, through December 31, 1961, for a number of work days aggregating at least 250 work days, occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees in the Special Exposure Cohort.

    Note: This class was established from Petition 199

Petitions Qualified for Evaluation

Below is a list of the petitions that qualified for evaluation. Select a petition on the list to view the table for that particular petition.

Petition 199 (October 1, 1952 to December 31, 1961)

Petition 199
Steps in Petition Process: Petition Details:
Date Received

 

March 13, 2012

 

Date Qualified for Evaluation

 

March 20, 2012

 

Summary of Information in Petition

 

Job Titles and/or Job Duties: All employees of the Department of Energy, its predecessor agencies, and its contractors and subcontractors

Period of Employment: October 1, 1952 to December 31, 1961

Note: The information above is what qualified for evaluation. During our evaluation of whether dose reconstructions can adequately be completed for the above job titles and period of employment, information may cause NIOSH to change some the dates or job titles/duties. Therefore, as this petition proceeds through the SEC petition process and if an SEC class is proposed, the proposed class may not exactly match the above information.

Copy of the Petition Received

Winchester Engineering and Analytical Center Petition [459 KB (1 page)]

Federal Register Notice Announcing that a Winchester Engineering and Analytical Center SEC Petition has met the Minimum Qualifications for Review and Evaluation

March 27, 2012 [49 KB (1 page)]

SEC Petition Evaluation Report

Revised May 31, 2012 [500 KB (31 pages)]

Evaluation Report Sent to the Advisory Board

April 7, 2010

Petition Discussed by the Advisory Board

The petition was discussed by the Advisory Board on June 19, 2012, during its regular meeting.

Note: the agenda for this meeting is available on the Advisory Board and Public Meetings page.

Advisory Board Recommendation on SEC Petition

July 27, 2012 [299 KB (2 pages)]

HHS Letters to Congress Regarding the SEC Petition

August 23, 2012 [451 KB (10 pages)]

HHS Designation of Additional Members to the SEC

August 23, 2012 [42 KB (5 pages)]

Federal Register Notice: Designation/Determination Regarding a Class of Employees for Addition to the Special Exposure Cohort

September 20, 2012 [48 KB (1 page)]

Note: A “designation” will be published if there is a recommendation to add a class to the SEC. A “determination” will be published if there is a recommendation not to add a class to the SEC.

Effective Date for the SEC Class

September 22, 2012

Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort

October 3, 2012 [50 KB (1 page)]

Letter to DOL Regarding the Addition of a New Class of Employees to the SEC

September 28, 2012 [40 KB (1 page)]

Public Comments on Winchester Engineering and Analytical Center Documents

How to Submit Comments

Members of the public can provide comments on Winchester Engineering and Analytical Center documents. Comments should be submitted to the NIOSH Docket Officer electronically by e-mail at nioshdocket@cdc.gov or printed comments can be mailed to:

NIOSH Docket Office
Robert A. Taft Laboratories, MS-C34
1090 Tusculum Avenue
Cincinnati, OH 45226
Please include the Site Profile/Docket Number (253) on all comments.

Comments Received

At this time, no comments have been submitted on Winchester Engineering and Analytical Center documents.

Document Archive for Winchester Engineering and Analytical Center

TOP