Skip directly to search Skip directly to A to Z list Skip directly to navigation Skip directly to page options Skip directly to site content

SILICA

	worker doing silica sand blasting

Evaluation of Substitute Materials for Silica Sand in Abrasive Blasting

Contract No. 200-95-2946

Phase 1, Appendix 9 contains a hard copy of the Journal of Protective Coatings & Linings (JPCL) article titled "Achieving Productivity from Abrasive Blast Cleaning Systems." Written permission was obtained from the JPCL to reproduce and disseminate this article, which is cited as reference number 10 in the reference section on page 146. The complete reference is reproduced as follows: "Achieving Productivity from Abrasive Blast Cleaning Systems," Journal of Protective Coatings & Linings, Volume No. 9, September 1989, pp 31-36.

View the article [PDF - 35 KB]

View the associated charts [PDF - 359 KB]

Return

Top
Error processing SSI file