2012 Advisory Board and Public Meetings
This page contains a listing of Advisory Board and public meetings. When available, locations, times, telephone conference access information, agendas, and transcripts from the meetings are provided.
Information on worker outreach meetings can be found on individual site pages. A list of the individual site pages can be found on the List of Work Sites page.
2012 Meetings
Summary
-
January 30, 2012
Meeting of the Advisory Board’s Work Group on Linde Ceramics PlantTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
January 9, 2012
Meeting of the Advisory Board’s Subcommittee on Procedures Review9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Summary
- February 28-29: Meeting of the Advisory Board on Radiation and Worker Health
- February 21: Teleconference Meeting of the Advisory Board’s Work Group on Brookhaven National Laboratory
- February 15: Teleconference Meeting of the Advisory Board’s Work Group on Linde Ceramics Plant
- February 14: Teleconference Meeting of the Advisory Board’s Work Group on Uranium Refining Atomic Weapons Employers (AWEs)
- February 14: Teleconference Meeting of the Advisory Board’s Work Group on Weldon Spring Plant
- February 9: Meeting of the Advisory Board’s Work Group on Fernald
- February 3: Meeting of the Advisory Board’s Work Group on Lawrence Berkeley National Laboratory
-
February 28-29, 2012
Meeting of the Advisory Board on Radiation and Worker HealthTime/Location:
9:45 a.m. Eastern Time
Public Comment Period: 5:00 p.m. – 6:30 p.m.
Meeting Type: Face-to-Face; Public, with Comment Period
Note: The public comment period may end before 6:30 p.m., following the last call for comments.Waterfront Hotel
10 Washington St.
Oakland, CA 94607
Phone: (510) 836-3800
Fax: (510) 832-6228Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda [128 KB (2 pages)]
- Transcript: February 28, 2012 [693 KB (292 pages)]
- Transcript: February 29, 2012 [698 KB (299 pages)]
Presentations:
- AWE Work Group: Status of Activities Related to Electro Met [317 KB (7 pages)]
- Brookhaven National Laboratory Special Exposure Cohort Petition Evaluation Report
- Clinton Engineer Works Special Exposure Cohort Petition Evaluation Report
- Department of Labor Program Update
- Electro Metallurgical Corporation Special Exposure Cohort Petition Evaluation (Report 00136-Rev 1)
- Hangar 481 Special Exposure Cohort Petition Evaluation Report Update
Below is the full presentation that was given at the August 2011 Advisory Board meeting. This presentation may be referenced during the discussions of the above presentation.
August 2011: Hangar 481 Special Exposure Cohort Petition Evaluation Report Update
- Lawrence Berkeley National Laboratory Work Group Report
- NIOSH Program Update
- Sandia National Laboratories-Albuquerque Special Exposure Cohort Petition Evaluation Report
- SC&A: Fernald SEC Petition Review [709 KB (32 pages)]
- SC&A: Lawrence Berkeley National Laboratory (LBNL) [234 KB (5 pages)]
- SC&A: Stanford Linear Accelerator Center (SLAC) [225 KB (4 pages)]
- SC&A: Status of AWE Work Group Activities Related to Electro Met [225 KB (6 pages)]
- Status of Activities for Lawrence Berkeley National Laboratory and the Stanford Linear Accelerator Center
- Status of Upcoming SEC Petitions
- Weldon Spring Work Group Update: Weldon Spring Site SEC-00143
-
February 21, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Brookhaven National LaboratoryTime/Location:
11:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
February 15, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Linde Ceramics PlantTime/Location:
10:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
February 14, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Uranium Refining Atomic Weapons Employers (AWEs)Time/Location:
2:00 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
February 14, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Weldon Spring PlantTime/Location:
10:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
February 9, 2012
Meeting of the Advisory Board’s Work Group on FernaldTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
- SC&A Draft White Paper: Evaluation of the Impact of Recycled Thorium on Potential Worker Exposures at Fernald – An Interim Report [139 KB (20 pages)]
Contract Number 200-2009-28555, Rev.-00
February 8, 2012 - SC&A Draft: SC&A’s Response to NIOSH’s Subgroup 10A Impact Analysis Dated November 1, 2011 [78 KB (13 pages)]
Contract No. 200-2009-28555, Rev.-00
February 6, 2012 - SC&A Memo: SC&A Final Position on the Th-232 In-vivo Data Quality and Adequacy for FEMP Workers [68 KB (12 pages)]
January 30, 2012 - SC&A Draft White Paper: SC&A Review of “NIOSH Evaluation of Fernald Subcontractor Bioassay Data, Revision 1” [361 KB (28 pages)]
Contract No.: 200-2009-28555
January 23, 2012 - SC&A Draft White Paper: SC&A Position on In-Vivo Thorium Monitoring Completeness [218 KB (19 pages)]
Contract No.: 200-2009-28555
January 20, 2012
- SC&A Draft White Paper: Evaluation of the Impact of Recycled Thorium on Potential Worker Exposures at Fernald – An Interim Report [139 KB (20 pages)]
-
February 3, 2012
Meeting of the Advisory Board’s Work Group on Lawrence Berkeley National LaboratoryTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Summary
-
March 30, 2012
Meeting of the Advisory Board’s Subcommittee for Dose Reconstruction ReviewsTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
March 28, 2012
Meeting of the Advisory Board’s Work Group on TBD 6000Time/Location:
8:30 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
Draft: Issue Resolution Matrix for SC&A Findings on the General Steel Industries Special Exposure Cohort (SEC) Petition-00105 and the NIOSH SEC Petition Evaluation Report [106 KB (19 pages)]
March 22, 2012 -
Memo: Review of “Addendum to Dose Estimates for Betatron Operations White Paper” [44 KB (4 pages)]
March 25, 2012 -
Battelle-TBD Appendix BB General Steel Industries: Addendum to Dose Estimates for Betatron Operations White Paper [88 KB (7 pages)]
March 2012 -
Draft White Paper: Response to “Battelle-TBD-6000 Appendix BB General Steel Industries: Dose Estimates for Betatron Operations” [303 KB (23 pages)]
Contract Number 200-2009-28555
March 12, 2012 -
Docket 140 (GSI) Submission from Daniel W. McKeel, Jr., M.D.: presentation to the Advisory Board’s Work Group on TBD 6000 on March 15, 2012 [2.7 MB (29 pages)]
March 17, 2012
-
Draft: Issue Resolution Matrix for SC&A Findings on the General Steel Industries Special Exposure Cohort (SEC) Petition-00105 and the NIOSH SEC Petition Evaluation Report [106 KB (19 pages)]
-
March 16, 2012–POSTPONED
Meeting of the Advisory Board’s Work Group on Mound PlantNote: This meeting will be rescheduled at a later date.
Time/Location:
9:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- An agenda will be provided at a later date.
-
March 15, 2012
Meeting of the Advisory Board’s Work Group on TBD 6000Time/Location:
8:30 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
Phone: 859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
Draft White Paper: Response to “Battelle-TBD-6000 Appendix BB General Steel Industries: Dose Estimates for Betatron Operations” [303 KB (23 pages)]
Contract Number 200-2009-28555
March 12, 2012 - SC& A presentation: Response to “Battelle-TBD-6000 Appendix BB General Steel Industries: Dose Estimates for Betatron Operations” [1.5 MB (12 pages)]
-
Draft White Paper: Response to “Battelle-TBD-6000 Appendix BB General Steel Industries: Dose Estimates for Betatron Operations” [303 KB (23 pages)]
Summary
- April 26: Teleconference Meeting of the Advisory Board on Radiation and Worker Health
- April 19: Teleconference Meeting of the Advisory Board’s Work Group on Fernald
- April 18: Teleconference Meeting of the Advisory Board’s Work Group on SEC Issues
- April 17: Meeting of the Advisory Board’s Work Group on Science Issues
- April 11: Meeting of the Advisory Board’s Subcommittee on Procedures Review
- April 10: Meeting of the Advisory Board’s Work Group on Mound Plant
-
April 26, 2012
Teleconference Meeting of the Advisory Board on Radiation and Worker HealthTime/Location:
11:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
NIOSH Paper: Use of Mobile Counter Thorium Mass Results as a Bounding Estimate [73 KB (1 page)]
April 26, 2012 -
SC&A Presentation: Fernald SEC Petition Review [444 KB (13 pages)]
April 26, 2012 -
DCAS Position on “Technical Shortfall” of Thorium In Vivo Monitoring as a Basis for Finding of Insufficient Accuracy [103 KB (2 pages)]
April 2012 -
Draft Presentation: Bounding Thorium-232 Intakes Using MIVRML Data [329 KB (8 pages)]
April 2012 -
SC&A Memo: SC&A Comments on Slide 7 of NIOSH Presentation [85 KB (4 pages)]
April 17, 2012 -
SC&A Draft: Summary of SC&A Concerns Regarding the Latest Documents Posted by NIOSH to Complement Their White Papers on In-vivo Thorium Bioassay [130 KB (22 pages)]
Contract Number 200-2009-28555
April 6, 2012
-
NIOSH Paper: Use of Mobile Counter Thorium Mass Results as a Bounding Estimate [73 KB (1 page)]
-
April 19, 2012
Teleconference Meeting of the Advisory Board’s Work Group on FernaldTime/Location:
11:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
DCAS Position on “Technical Shortfall” of Thorium In Vivo Monitoring as a Basis for Finding of Insufficient Accuracy [103 KB (2 pages)]
April 2012 -
Draft Presentation: Bounding Thorium-232 Intakes Using MIVRML Data [329 KB (8 pages)]
April 2012 -
SC&A Memo: SC&A Comments on Slide 7 of NIOSH Presentation [85 KB (4 pages)]
April 17, 2012 -
SC&A Draft: Summary of SC&A Concerns Regarding the Latest Documents Posted by NIOSH to Complement Their White Papers on In-vivo Thorium Bioassay [130 KB (22 pages)]
Contract Number 200-2009-28555
April 6, 2012
-
DCAS Position on “Technical Shortfall” of Thorium In Vivo Monitoring as a Basis for Finding of Insufficient Accuracy [103 KB (2 pages)]
-
April 18, 2012
Teleconference Meeting of the Advisory Board’s Work Group on SEC IssuesTime/Location:
1:30 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
April 17, 2012
Meeting of the Advisory Board’s Work Group on Science IssuesTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
April 11, 2012
Meeting of the Advisory Board’s Subcommittee on Procedures ReviewTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
April 10, 2012
Meeting of the Advisory Board’s Work Group on Mound PlantTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
Summary
-
May 30, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Linde Ceramics PlantTime/Location:
2:30 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
May 14, 2012
Meeting of the Advisory Board’s Work Group on Los Alamos National Laboratory (LANL)Time/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
Summary
- June 19-21: Meeting of the Advisory Board on Radiation and Worker Health
- June 14: Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000
- June 7: Teleconference Meeting of the Advisory Board’s Work Group on Weldon Spring Plant
- June 6, 2012: Meeting of the Advisory Board’s Subcommittee for Dose Reconstruction Reviews
- June 5: Meeting of the Advisory Board’s Work Group on Mound Plant
-
June 19-21, 2012
Meeting of the Advisory Board on Radiation and Worker HealthTime/Location:
8:15 a.m. Mountain Time (MT)
Meeting Type: Face-to-Face; Public, with Comment PeriodCourtyard Santa Fe
3347 Cerrillos Road
Santa Fe, NM 87507
Phone: 800-777-3347<<br /> Fax: 505-473-5128Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda [28 KB (3 pages)]
- Transcript: June 19 [649 KB (371 pages)]
- Transcript: June 20 [598 KB (295 pages)]
- Transcript: June 21 [208 KB (57 pages)]
Discussion Paper:
Presentations (listed in the order they will occur during the meeting):
Tuesday, June 19th:
- NIOSH Program Update (NIOSH)
- DOL Program Update (DOL)
- DOE Program Update (DOE)
- Winchester Engineering and Analytical Center Special Exposure Cohort Petition Evaluation Report (NIOSH)
- Weldon Spring Bounding Radon Model (NIOSH)
- Hanford Special Exposure Cohort Petition Evaluation Report (NIOSH)
- Los Alamos National Laboratory (LANL) SEC Petition Review (LANL Work Group)
Wednesday, June 20th:
- General Steel Industries (GSI) Special Exposure Cohort (NIOSH)
-
Full Color Version [216 KB (30 pages)]
Revised June 14, 2012 -
Black & White Printer Friendly Version [472 KB (30 pages)]
(Revised June 14, 2012)
-
Full Color Version [216 KB (30 pages)]
- Radiological Assessment of General Steel Industries (GSI)(SC&A)
- Recommendations on SEC Petition 105 for General Steel Industries (TBD-6000 Work Group)
- Clarksville Modification Center, Ft. Campbell Special Exposure Cohort Petition Evaluation Report (formerly known as Clarksville Facility) (NIOSH)
- Mound Plant SEC Petition Review (Mound Work Group)
- Titanium Alloys Manufacturing Special Exposure Cohort Petition Evaluation Report (NIOSH)
Thursday, June 21st:
- Medina Modification Center Special Exposure Cohort Petition Evaluation Report (NIOSH)
- Linde Ceramics Plant Work Group Report (Linde Ceramics Plant Work Group)
- Status of Upcoming SEC Petitions (NIOSH)
-
June 14, 2012
Teleconference Meeting of the Advisory Board’s Work Group on TBD 6000Time/Location:
9:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
Comments from Daniel W. McKeel, Jr., M.D. on David Allen DCAS Memo Dated June 8, 2012 to the TBD-6000 Work Group of the ABRWH in Response to the SC&A Discussion Paper Update on GSI Intake Doses [205 KB (6 pages)]
June 13, 2012 -
SC&A Memo: Reply to NIOSH Response to SC&A Memo Dated May 30, 2012 [29 KB (4 pages)]
June 11, 2012 -
NIOSH/DCAS: Battelle-TBD-6000 Appendix BB General Steel Industries Response to SC&A memo dated May 30, 2012 Updated Review of Occupational Internal dose at GSI [211 KB (6 pages)]
June 8, 2012 -
SC&A Draft: Issue Resolution Matrix for SC&A Findings on the General Steel Industries Special Exposure Cohort (SEC) Petition-00105 and the NIOSH SEC Petition Evaluation Report [113 KB (20 pages)]
June 1, 2012 -
Comments from Daniel W. McKeel, Jr., M.D. on SC&A Discussion Paper dated 5/30/12 titled “Update of “Review of ‘Site Profiles for Atomic Weapons Employers That Worked Uranium and Thorium Metals – Appendix BB: General Steel Industries” Battelle-TBD-6000, Appendix BB,” Occupational Internal Dose [2 MB (25 pages)]
June 1, 2012 -
SC&A Memo: Update of “Review of ‘Site Profiles for Atomic Weapons Employers That Worked Uranium and Thorium Metals – Appendix BB: General Steel Industries,’ Battelle-TBD-6000, Appendix BB,”Occupational Internal Dose” [49 KB (6 pages)]
May 30, 2012
-
Comments from Daniel W. McKeel, Jr., M.D. on David Allen DCAS Memo Dated June 8, 2012 to the TBD-6000 Work Group of the ABRWH in Response to the SC&A Discussion Paper Update on GSI Intake Doses [205 KB (6 pages)]
-
June 7, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Weldon Spring PlantTime/Location:
1:30 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
June 6, 2012
Meeting of the Advisory Board’s Subcommittee for Dose Reconstruction ReviewsTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
June 5, 2012
Meeting of the Advisory Board’s Work Group on Mound PlantTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
SC&A Memo: Reply to NIOSH Comments on SC&A’s Thorium Report of May 2, 2012 [37 KB (5 pages)]
Contract No. 200-2009-28555
June 1, 2012 -
NIOSH/DCAS: NIOSH Response to SC&A’s January 12, 2012 Memo Report on Adequacy and Completeness of Mound Internal Dosimetry [106 KB (4 pages)]
May 29, 2012 -
NIOSH/DCAS: NIOSH Responses to SC&A’s Thorium Report of May 8, 2012 [88 KB (4 pages)]
May 29, 2012 -
SC&A Draft: Mound Laboratory Site Potential Exposures to Stable Metal Tritides [1.5 MB (92 pages)]
May 24, 2012 -
SC&A’s Evaluation of NIOSH’s April 2012 Mound Laboratory Th-232 White Paper [34 KB (5 pages)]
May 2012
-
SC&A Memo: Reply to NIOSH Comments on SC&A’s Thorium Report of May 2, 2012 [37 KB (5 pages)]
-
July 31, 2012
Meeting of the Advisory Board’s Subcommittee on Procedures ReviewTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Item:
Summary
- August 31: Teleconference Meeting of the Advisory Board’s Work Group on the Mound Plant
- August 29: Meeting of the Advisory Board’s Work Group on Worker Outreach
- August 28: Meeting of the Advisory Board’s Work Group on TBD 6000
- August 15: Teleconference Meeting of the Advisory Board on Radiation and Worker Health
- August 7, 2012–CANCELED: Meeting of the Advisory Board’s Work Group on the Mound Plant
- August 6: Meeting of the Advisory Board’s Subcommittee for Dose Reconstruction Reviews
-
August 31, 2012
Teleconference Meeting of the Advisory Board’s Work Group on the Mound PlantTime/Location:
1:30 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
August 29, 2012
Meeting of the Advisory Board’s Work Group on Worker OutreachTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
- Claimant Correspondence: Updated Version of the Work History and Radiation Exposure Questions Introductory Letter [41 KB (3 pages)]
- Claimant Correspondence: Previous Version of the Work History and Radiation Exposure Questions Introductory Letter [31 KB (2 pages)]
- Claimant Correspondence: Updated Version of the Special Exposure Cohort (SEC) Evaluation Report Letter (without sample content) [28 KB (2 pages)]
- Claimant Correspondence: Updated Version of the Special Exposure Cohort (SEC) Evaluation Report Letter (with sample content) [29 KB (2 pages)]
- Claimant Correspondence: Previous Version of the Special Exposure Cohort (SEC) Evaluation Report Letter [18 KB (1 page)]
-
August 28, 2012
Meeting of the Advisory Board’s Work Group on TBD 6000Time/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Presentations:
- SC&A Presentation: Alternative Model for the Calculation of Uranium Intakes at GSI [252 KB (10 pages)]
- SC&A Presentation: Review of the Use of Surrogate Data for Estimating Intakes of Uranium at General Steel Industries [97 KB (9 pages)]
Discussion Papers:
-
Comments from Daniel W. McKeel, Jr., M.D. regarding the agenda for the August 28, 2012, Meeting of the Advisory Board’s Work Group on TBD 6000 [54 KB (3 pages)]
August 21, 2012 -
NIOSH/DCAS: Use of Surrogate Data at GSI – Response to SC&A Review Dated July 16, 2012 [309 KB (12 pages)]
August 2012 -
Comments from Daniel W. McKeel, Jr., M.D. regarding the SC&A Memo: Alternative Model for the Calculation of Uranium Intakes at GSI [3.3 MB (28 pages)]
August 5, 2012 -
Comments from Daniel W. McKeel, Jr., M.D. regarding the General Steel Industries Special Exposure Cohort Petition-00105 [428 KB (14 pages)]
July 26, 2012 -
SC&A Memo: Alternative Model for the Calculation of Uranium Intakes at GSI [218 KB (13 pages)]
July 25, 2012 -
SC&A Draft White Paper: Review of the Use of Surrogate Data for Estimating Intakes of Uranium at General Steel Industries, Rev. 0 [132 KB (12 pages)]
July 16, 2012 -
Comments from Daniel W. McKeel, Jr., M.D. regarding the General Steel Industries Special Exposure Cohort Petition-00105 [1.7 MB (24 pages)]
July 10, 2012
-
August 15, 2012
Teleconference Meeting of the Advisory Board on Radiation and Worker HealthTime/Location:
11:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
Presentations:
- Ventron Corporation SEC Petition Evaluation Report
Full Color [380 KB (24 pages)]
August 2012 -
Black & White Printer Friendly Version [221 KB (24 pages)]
August 2012
- Ventron Corporation SEC Petition Evaluation Report
-
August 7, 2012–CANCELED
Meeting of the Advisory Board’s Work Group on the Mound PlantNote: This meeting will be rescheduled at a later date.
9:00 a.m. Eastern Time–POSTPONED
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- An agenda will be provided at a later date.
-
August 6, 2012
Meeting of the Advisory Board’s Subcommittee for Dose Reconstruction ReviewsTime/Location:
8:30 a.m. Eastern Time–POSTPONED
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Summary
- September 18-20: Meeting of the Advisory Board on Radiation and Worker Health
- September 12: Teleconference Meeting of the Advisory Board’s Work Group on Hanford
- September 11-MEETING TIME CHANGED: Teleconference Meeting of the Advisory Board’s Work Group on Los Alamos National Laboratory (LANL)
- September 10: Teleconference Meeting of the Advisory Board’s Work Group on Weldon Spring Plant
- September 7–CHANGED TO A TELECONFERENCE: Teleconference Meeting of the Advisory Board’s Work Group on Uranium Refining Atomic Weapons Employers (AWEs)
-
September 18-20, 2012
Meeting of the Advisory Board on Radiation and Worker HealthTime/Location:
8:15 a.m. Mountain Time (MT)
Meeting Type: Face-to-Face; Public, with Comment PeriodDenver Marriott Tech Center
4900 South Syracuse
Denver, CO 80237
Phone: (303) 779-1100
Fax: (303) 740-2523- Agenda [45 KB (3 pages)]
- Transcript: September 18 [961 KB (440 pages)]
- Transcript: September 19 [716 KB (324 pages)]
- Transcript: September 20 [147 KB (62 pages)]
Presentations (listed in the order they occurred during the meeting):
Tuesday, September 18, 2012
- NIOSH Program Update (NIOSH)
- DOL Program Update (DOL)
- DOE Program Update (DOE)
- Oak Ridge National Laboratory SEC Petition (83.14) (NIOSH)
- Hanford SEC Petition (#155; 1987-1989) (Advisory Board)
- Los Alamos National Laboratory SEC Petition (1976-1995 (NIOSH)
- Rocky Flats Plant SEC Petition (1972-1989) (NIOSH)
Wednesday, September 19, 2012
- GSI SEC Petition Update (NIOSH)
- TBD-6000 Work Group Report on SEC Petition 105 for General Steel Industries (Advisory Board)
- General Steel Industries SEC Petition 105 (Co-Petitioner Daniel W. McKeel, Jr., MD)
- Pantex SEC Petition (1984-1991) (NIOSH)
- Pantex SEC Petition Review (1951-1958, 1984-1991) (Advisory Board)
- Baker-Perkins Co. Technical Basis Document Review (Advisory Board)
- Weldon Spring Plant SEC Petition (NIOSH)
- Mound Plant SEC Petition (1972, 1975-1976) (83.14) (NIOSH)
- Mound Plant SEC Petition (1980-2007) (NIOSH)
- United Nuclear Corp. SEC Petition (Advisory Board)
Thursday, September 20, 2012
- Nuclear Metals Inc. SEC Petition (NIOSH)
- SEC Petitions Status Update (NIOSH)
-
September 12, 2012
Teleconference Meeting of the Advisory Board’s Work Group on HanfordTime/Location:
1:00 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Presentations:
Discussion Papers:
-
September 11, 2012-MEETING TIME CHANGED
Teleconference Meeting of the Advisory Board’s Work Group on Los Alamos National Laboratory (LANL)Time/Location:
2:00 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Paper:
-
September 10, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Weldon Spring PlantTime/Location:
1:00 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
September 7, 2012–CHANGED TO A TELECONFERENCE
Teleconference Meeting of the Advisory Board’s Work Group on Uranium Refining Atomic Weapons Employers (AWEs)Time/Location:
9:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Paper:
-
SC&A Memo: Du Pont Deepwater Works Issues Matrix [53 KB (2 pages)]
September 4, 2012
-
SC&A Memo: Du Pont Deepwater Works Issues Matrix [53 KB (2 pages)]
No meetings have been scheduled for this month.
Summary
- November 30: Teleconference Meeting of the Advisory Board’s Work Group on Hanford
- November 28: Meeting of the Advisory Board’s Work Group on TBD 6000
- November 27: Meeting of the Advisory Board’s Subcommittee for Dose Reconstruction Reviews
- November 19: Teleconference Meeting of the Advisory Board’s Work Group on the Pinellas Plant
- November 8: Meeting of the Advisory Board’s Work Group on Worker Outreach
- November 5: Teleconference Meeting of the Advisory Board on Radiation and Worker Health
- November 1: Meeting of the Advisory Board’s Subcommittee on Procedures Review
-
November 30, 2012
Teleconference Meeting of the Advisory Board’s Work Group on HanfordTime/Location:
11:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Presentation:
-
November 28, 2012
Meeting of the Advisory Board’s Work Group on TBD 6000Time/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
SC&A: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 [161 KB (23 pages)]
November 26, 2012 -
SC&A Draft White Paper: Review of New Surrogate Data for Estimating Intakes of Uranium at General Steel Industries [152 KB (18 pages)]
Contract Number 200-2009-28555
November 25, 2012 -
Comments from Daniel W. McKeel, Jr., M.D. regarding NIOSH/DCAS: Evaluation of Additional Air Sample Data Applicable to GSI [1 MB (20 pages)]
November 10, 2012-
Addendum 1 [251 KB (4 pages)]
November 10, 2012 -
Addendum 2 [6 MB (9 pages)]
November 26, 2012
-
Addendum 1 [251 KB (4 pages)]
-
NIOSH/DCAS: Evaluation of Additional Air Sample Data Applicable to GSI [316 KB (10 pages)]
November 2012
-
SC&A: Issue Resolution Matrix for SC&A Findings on Appendix BB to TBD-6000 [161 KB (23 pages)]
-
November 27, 2012
Meeting of the Advisory Board’s Subcommittee for Dose Reconstruction ReviewsTime/Location:
8:30 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
-
November 19, 2012
Teleconference Meeting of the Advisory Board’s Work Group on the Pinellas PlantTime/Location:
11:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Discussion Paper:
-
SC&A Pinellas Plant Work Group Update [98 KB (13 pages)]
November 19, 2012
-
SC&A Pinellas Plant Work Group Update [98 KB (13 pages)]
-
November 8, 2012
Meeting of the Advisory Board’s Work Group on Worker OutreachTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
November 5, 2012
Teleconference Meeting of the Advisory Board on Radiation and Worker HealthTime/Location:
11:00 a.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
-
November 1, 2012
Meeting of the Advisory Board’s Subcommittee on Procedures ReviewTime/Location:
9:00 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, No Comment PeriodCincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
859-586-0166Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Items:
Summary
-
December 11-12, 2012
Meeting of the Advisory Board on Radiation and Worker HealthTime/Location:
8:15 a.m. Eastern Time
Meeting Type: Face-to-Face; Public, with Comment PeriodHilton Knoxville
501 West Church Avenue
Knoxville, TN 37902
Phone: (865) 251-2523
Fax: (865) 546-1716Teleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
- Agenda [35 KB (2 pages)]
- Transcript: December 11, 2012 [830 KB (380 pages)]
- Transcript: December 12, 2012 [270 KB (119 pages)]
Presentations (listed in the order they will occur during the meeting):
Tuesday, December 11th:
- NIOSH Program Update
-
Department of Labor (DOL) Program Update
-
Department of Energy (DOE) Program Update
-
NIOSH: Update on 10-Year Review Implementation
-
NIOSH: Hanford SEC Petition SEC-00155
-
NIOSH: Battelle Laboratories, King Avenue SEC Petition–SEC-00208
-
NIOSH: Savannah River Site (SRS) Special Exposure Cohort Petition–SEC-00103
-
NIOSH: General Steel Industries (GSI) Special Exposure Cohort Petition–SEC-00105
-
Advisory Board: TBD-6000 Work Group – Report on SEC Petition 00105 for General Steel Industries
-
Advisory Board: Parameters to Consider when Processing Claims for Construction Trade Workers–ORAUT-OTIB-0052
-
Advisory Board Procedures Subcommittee: Report to the Advisory Board on Radiation and Worker Health
Wednesday, December 12th:
- NIOSH: Joslyn Manufacturing and Supply Co. SEC Petition–SEC-00200
- NIOSH: Special Exposure Cohort (SEC) Status Update
- NIOSH: Baker Brothers Special Exposure Cohort Petition–SEC-00204
Discussion Papers:
-
December 7, 2012
Teleconference Meeting of the Advisory Board’s Work Group on Oak Ridge Gaseous Diffusion Plant (K-25), Paducah Gaseous Diffusion Plant, and Portsmouth Gaseous Diffusion PlantTime/Location:
1:00 p.m. Eastern Time
Meeting Type: Teleconference; Public, No Comment PeriodTeleconference: +1-866-659-0537
Participant Code: 9933701Available Meeting Items:
Discussion Papers:
Pre-Decisional Document Policy
Please note that as part of the procedures and processes of the Advisory Board’s Work Groups, several kinds of pre-decisional documents may be developed. These pre-decisional documents, such as white papers, matrices, working drafts, etc., are distributed among Work Group members as research and background tools to facilitate discussion and deliberation. Although discussion during a public meeting may cover pre-decisional documents, these documents often are not further revised or finalized, and thus do not reflect the final determination or evaluation of the Advisory Board and its Work Groups. Additionally, some pre-decisional documents not otherwise posted on the website may contain sensitive information, which would require an interested party to obtain such documents by filing a Freedom of Information Act (FOIA) request with the CDC/ATSDR FOIA office at foiarequests@cdc.gov.
- Page last reviewed: September 28, 2015
- Page last updated: September 26, 2014
- Content source:
- National Institute for Occupational Safety and Health Division of Compensation Analysis and Support